‹ Rolling stock

Train of the day

One train a day from the 96 drawn in full: 71 in service and 25 withdrawn. Each comes once before any comes again, and some days are kept for an anniversary of the train or a line it runs on. Every day is written down when it is chosen, so this list never changes after the event.

Today

On this day in 1999 Docklands Light Railway: The extension under the Thames to Lewisham is officially opened.

B90, B92 and B2K Stock

In service since 1991 · top speed 50 mph (80 km/h) · 6 cars · built by BN Constructions Ferroviaires et Métalliques and others

The DLR's older fleet of two-section articulated cars, being replaced by the B23s.

10 m (33 ft)

Coming up

  1. Standard StockIn service 1923 to 1966 · built by Metropolitan Carriage and othersOn this day in 1947 The Central line: White City opens, replacing Wood Lane.
  2. Class 707 Desiro CityIn service since 2017 · built by Siemens Mobility
  3. Class 730 AventraIn service since 2023 · built by Bombardier Transportation
  4. Class 720 AventraIn service since 2020 · built by Bombardier TransportationOn this day in 2020 The first entered service on 26 November 2020, two units coupled on the 16:10 from Southend Victoria to Liverpool Street.
  5. Class 142 PacerIn service 1985 to 2020 · built by British Rail Engineering LimitedOn this day in 2020 Northern: The last Pacer to carry Northern passengers, 142004, runs from Kirkby to Manchester Victoria, ending more than 35 years of the class in the North; Northern had 102 Pacers.
  6. Class 777In service since 2023 · built by StadlerOn this day in 2024 Merseyrail: The last Class 507s carry passengers; regular 507 and 508 workings had ended on 25 August, when eight-car Class 777 trains took over the Southport line.
  7. Eurotunnel Class 9In service since 1994

Past trains

November 2026

  1. B90, B92 and B2K StockIn service since 1991 · built by BN Constructions Ferroviaires et Métalliques and othersOn this day in 1999 Docklands Light Railway: The extension under the Thames to Lewisham is officially opened.
How the train is chosen

Every train with a full drawing can be chosen: 96 today. The trains come in cycles, each once, in an order shuffled afresh for every cycle, and none within a fortnight of its last day. A train drawn in full joins after the days already written; one whose drawing becomes indicative leaves, and only its future days go to another train.

Some days are kept for a dated pick: the anniversary of a train's first or last day, or of a line it runs on opening or reaching somewhere new, each checked against a published source. The record is written 60 days ahead and never rewritten once a day has come.

Sources for the dates

Show the 37 sources from Transport for London, Clive Feather, Subterranea Britannica and 11 more

Last checked

Top