Tyne and Wear Metro
Britain's first light rapid transit system: two lines, the Green and the Yellow, with 60 stations and 48.5 miles of route through Newcastle, Gateshead, North and South Tyneside and Sunderland. Much of it runs on old suburban railways, joined up by new tunnels under the centres of Newcastle and Gateshead and a bridge over the Tyne. It opened in 1980, reached Newcastle Airport in 1991 and Sunderland in 2002, sharing Network Rail's track from Pelaw. Its 46 Stadler trains have replaced the original Metrocars, which ran from 1980 to 2026.
Facts
- Opened
- 11 August 1980
- Lines
- Green line, Airport to South Hylton; Yellow line, St James to South Shields, round the coast
- Type
- light rapid transit, two lines
- Depots
- Gosforth
- Operating company
- Nexus, the Tyne and Wear Passenger Transport Executive, which owns and runs it, as an executive body of the North East Mayoral Strategic Authority; Stadler, which built the trains, has the team that maintains them at Gosforth depot
- Shares track
- Network Rail's line from Pelaw to Sunderland, about 9 miles (14 km) to just beyond Sunderland station, with main-line passenger and freight trains: the first track in Britain shared by light and heavy rail. The line on to South Hylton is the Metro's own.
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
5 cars, 197 ft (59.9 m)
Route 60 stations
Yellow line: St James – South Shields, round the coast 41
Green line: Airport – South Hylton 31
Schematic, not to scale. Ringed stations are interchanges. Yellow line trains run from St James through Monument and round the coast, by Wallsend, Tynemouth and Whitley Bay, to South Gosforth, then back through Monument to Gateshead and South Shields, so they call at Monument twice and its strip shows it twice. The two lines share the 12 stations from South Gosforth to Pelaw, ringed as interchanges between them. Central Station, Heworth, Northumberland Park and Sunderland are interchanges with National Rail trains, and from Pelaw to Sunderland the Metro runs on Network Rail's track. Station order from Nexus's timetables and its network map (see Sources).
| Station | Interchanges |
|---|---|
| St James | |
| Monument | Green line |
| Manors | |
| Byker | |
| Chillingham Road | |
| Walkergate | |
| Wallsend | |
| Hadrian Road | |
| Howdon | |
| Percy Main | |
| Meadow Well | |
| North Shields | |
| Tynemouth | |
| Cullercoats | |
| Whitley Bay | |
| Monkseaton | |
| West Monkseaton | |
| Shiremoor | |
| Northumberland Park | National Rail |
| Palmersville | |
| Benton | |
| Four Lane Ends | |
| Longbenton | |
| South Gosforth | Green line |
| Ilford Road | Green line |
| West Jesmond | Green line |
| Jesmond | Green line |
| Haymarket | Green line |
| Central Station | Green line, National Rail |
| Gateshead | Green line |
| Gateshead Stadium | Green line |
| Felling | Green line |
| Heworth | Green line, National Rail |
| Pelaw | Green line |
| Hebburn | |
| Jarrow | |
| Bede | |
| Simonside | |
| Tyne Dock | |
| Chichester | |
| South Shields | |
| Airport | |
| Callerton Parkway | |
| Bank Foot | |
| Kingston Park | |
| Fawdon | |
| Wansbeck Road | |
| Regent Centre | |
| Fellgate | |
| Brockley Whins | |
| East Boldon | |
| Seaburn | |
| Stadium of Light | |
| St Peter's | |
| Sunderland | National Rail |
| Park Lane | |
| University | |
| Millfield | |
| Pallion | |
| South Hylton |
Stations from the operator’s published routes, entered by hand (see Sources).
Rolling stock
- Class 555 since 2024
Earlier trains on this line
- Metrocar (Class 599) 1980–2026
History 22
- The Newcastle and North Shields Railway opens, the world's first suburban passenger railway; its line between Chillingham Road and North Shields is now part of the Metro.
- The busiest of Tyneside's suburban lines, Newcastle to Tynemouth, becomes one of the first outside London to be electrified. Electric trains cross the Tyne to South Shields by 1937; in 1967 diesel trains replace them.
- The Tyne and Wear Passenger Transport Authority and Executive are set up. Their study finds that the best way to improve public transport is to turn the suburban railways into a rapid transit system reaching into the city centre.
- The Government agrees a grant of 75% of the cost of the system's infrastructure.
- Building starts, with the first contracts for tunnels under the centres of Newcastle and Gateshead.
- The first two Metrocars, prototypes, begin trials on a test track built for them at Middle Engine Lane in North Tyneside.
- The Metro opens to passengers, from Haymarket to Tynemouth; the cheapest ticket is 8p.
- The Metro crosses the Tyne to Gateshead, as far as Heworth.
- The Queen officially opens the Metro, crossing the new Queen Elizabeth II Metro Bridge from Gateshead to Newcastle.
- The North Tyne loop is completed, round by the coast.
- The line to South Shields opens, finishing the original network: 34 miles (55 km) of track and 44 stations, worked by 90 Metrocars. In its first full year it carries more than 60 million journeys.
- The Metro reaches Newcastle International Airport, with new stations at Callerton Parkway and the airport; 10,000 people ride it to the airport on the opening day.
- The line to Sunderland and South Hylton opens, with 12 stations: eight new, and four main-line stations rebuilt (Brockley Whins, East Boldon, Seaburn and Sunderland). From Pelaw to just beyond Sunderland it runs on Network Rail's track with main-line passenger and freight trains, a first in Britain; then on new track along the old railway to South Hylton.
- The Queen officially opens the Sunderland line at Park Lane Interchange, in her Golden Jubilee year.
- Nexus appoints Stadler to build 46 new trains, in a £362 million programme that includes a new depot at Gosforth.
- A temporary depot at Howdon, in North Tyneside, opens, built to take in the new trains and to look after up to a quarter of the old fleet while Gosforth depot is rebuilt.
- The first new train, a Class 555, arrives from Stadler's factory in Switzerland, hauled all the way by rail.
- The new depot at Gosforth is completed.
- The first Class 555 enters service with passengers.
- The last of the 46 new trains arrives at Gosforth depot.
- A National Rail station opens at Northumberland Park on Northern's new Northumberland Line, as an interchange with the Metro, with trains to Newcastle and Ashington.
- The original Metrocars make their last guaranteed runs with passengers, on both lines, after 46 years and 1.7 billion journeys. Two are kept for their heritage, one goes for firefighters' training and the rest are recycled.
Sources 20
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 20 sources from Nexus, Department for Transport, The Chartered Institution of Highways & Transportation and 2 more
- Light rail and tram statistics (LRT): data tables Department for Transport, 29 September 2026 (the year ending March 2026)31.5 million journeys in the year to March 2026 (LRT0101); 60 stations (LRT0201); 78.0 route km and 48.5 route miles (LRT0203, LRT0204)
- Timetable for the final week in service of Class 599 trains: Yellow line, St James – South Shields Nexus (Tyne and Wear Passenger Transport Executive), June 2026 (Monday 22 to Friday 26 June 2026)the Yellow line's stations in order, St James to South Shields, both ways
- Timetable for the final week in service of Class 599 trains: Green line, Airport – South Hylton Nexus (Tyne and Wear Passenger Transport Executive), June 2026 (Monday 22 to Friday 26 June 2026)the Green line's stations in order, Airport to South Hylton, both ways
- Metro network map Nexus (Tyne and Wear Passenger Transport Executive), undated, read 11 October 2026the two lines and their stations; the rail interchanges at Central Station, Heworth and Sunderland; the lines' colours
- Metro's original train fleet nears the end of its time in service Nexus (Tyne and Wear Passenger Transport Executive), 2 June 2026the Yellow line from St James to South Shields and the Green line from Airport to South Hylton
- A new Metro fleet Nexus (Tyne and Wear Passenger Transport Executive), read 11 October 202660 stations; the new Gosforth depot
- Who we are Nexus (Tyne and Wear Passenger Transport Executive), read 11 October 2026Nexus, the Tyne and Wear Passenger Transport Executive, owns and runs the Metro
- Our governance Nexus (Tyne and Wear Passenger Transport Executive), read 11 October 2026Nexus an executive body of the North East Mayoral Strategic Authority; a railway running on part of the National Rail network
- Depot workers say a fond farewell to the old Metro trains Nexus (Tyne and Wear Passenger Transport Executive), 10 June 2026the depot team at Gosforth, who work for Stadler
- The Sunderland Metro line celebrates its 20th anniversary Nexus (Tyne and Wear Passenger Transport Executive), 30 March 2022the shared track from Pelaw to just beyond Sunderland station
- Building the Tyne and Wear Metro The Chartered Institution of Highways & Transportation (prepared by Nexus), undated (after 2002)the shared track from Pelaw to Sunderland; the tunnels and the bridge
- New station at Northumberland Park signals a new era of connectivity for North Tyneside North Tyneside Council, 23 February 2026Northumberland Park, an interchange with National Rail trains
- Our history Nexus (Tyne and Wear Passenger Transport Executive), read 11 October 2026history
- Feature: How the Tyne and Wear Metro was built Nexus (Tyne and Wear Passenger Transport Executive), 21 August 2020history
- Tyne and Wear Metro Nexus (Tyne and Wear Passenger Transport Executive), read 11 October 2026history
- Temporary Tyne and Wear Metro Depot commissioned Rail Engineer, 18 December 2020history
- All 46 new Metro trains are delivered Nexus (Tyne and Wear Passenger Transport Executive), 24 February 2026history
- Opening date for new Northumberland Line station is confirmed Nexus (Tyne and Wear Passenger Transport Executive), 28 January 2026history
- Metro's old train fleet set for its final week in service Nexus (Tyne and Wear Passenger Transport Executive), 25 June 2026history
- Long serving Metro driver 'proud' to drive the last old train Nexus (Tyne and Wear Passenger Transport Executive), 27 June 2026history
- The line colours: the Yellow line's #FFB63A and the Green line's #3FBA5A, sampled from Nexus's network map as rendered (the PDF gives them in print colours, 0/30/94/0 and 76/0/91/0 CMYK); Nexus publishes no screen colour. The system's colour is the Yellow line's
- Howdon depot: built as a temporary depot for the change of fleet (Rail Engineer, December 2020); whether it is still used now that Gosforth is rebuilt is not confirmed, so only Gosforth is listed
- Gosforth depot: Nexus's page on the new trains says it was completed in January 2024; its history timeline puts the new train's unveiling at the "newly opened Metro Depot" in 2023
- Manors: Northern's Northumberland Line trains call at Manors station, near the Metro's; Nexus's map doesn't mark it as an interchange, so it isn't ringed
Know a source for one of these? Send it to us → (opens in a new tab)