Underground › Metropolitan
Metropolitan line
The world's first underground railway, opened in 1863 between Paddington and Farringdon Street. It was built out into the countryside it called 'Metro-land', and runs today to Amersham, Chesham, Watford and Uxbridge, with only 9.7 km of its 66.7 km underground.
Facts
- Opened
- 10 January 1863
- Termini
- Aldgate – Amersham / Chesham / Watford / Uxbridge
- Type
- sub-surface
- Depots
- Neasden
- Shares track
- With the Hammersmith & City and Circle from Baker Street to Aldgate, the Piccadilly from Rayners Lane to Uxbridge, and Chiltern Railways from Harrow-on-the-Hill to Amersham. From Finchley Road to Wembley Park it runs beside the Jubilee, non-stop.
Route 34 stations
Harrow-on-the-Hill – Aldgate 14
Uxbridge – Harrow-on-the-Hill 9
Moor Park – Harrow-on-the-Hill 6
Amersham – Moor Park 5
Watford – Moor Park 3
Chesham – Chalfont & Latimer 2
Schematic, not to scale. Ringed stations are interchanges. Each strip is one branch, between junctions or termini. Station order from TfL open data.
| Station | Zone | Interchanges |
|---|---|---|
| Harrow-on-the-Hill | 5 | National Rail |
| Northwick Park | 4 | |
| Preston Road | 4 | |
| Wembley Park | 4 | Jubilee |
| Finchley Road | 2 | Jubilee |
| Baker Street | 1 | Bakerloo, Circle, Hammersmith & City, Jubilee |
| Great Portland Street | 1 | Circle, Hammersmith & City |
| Euston Square | 1 | Circle, Hammersmith & City |
| King's Cross St Pancras | 1 | Circle, Hammersmith & City, Northern, Piccadilly, Victoria, National Rail |
| Farringdon | 1 | Circle, Hammersmith & City, Elizabeth line, National Rail |
| Barbican | 1 | Circle, Hammersmith & City |
| Moorgate | 1 | Circle, Hammersmith & City, Northern, National Rail |
| Liverpool Street | 1 | Central, Circle, Hammersmith & City, Elizabeth line, Overground (Weaver), National Rail |
| Aldgate | 1 | Circle |
| Uxbridge | 6 | Piccadilly |
| Hillingdon | 6 | Piccadilly |
| Ickenham | 6 | Piccadilly |
| Ruislip | 6 | Piccadilly |
| Ruislip Manor | 6 | Piccadilly |
| Eastcote | 5 | Piccadilly |
| Rayners Lane | 5 | Piccadilly |
| West Harrow | 5 | |
| Moor Park | 6/7 | |
| Northwood | 6 | |
| Northwood Hills | 6 | |
| Pinner | 5 | |
| North Harrow | 5 | |
| Amersham | 9 | National Rail |
| Chalfont & Latimer | 8 | National Rail |
| Chorleywood | 7 | National Rail |
| Rickmansworth | 7 | National Rail |
| Watford | 7 | |
| Croxley | 7 | |
| Chesham | 9 |
Stations, zones and interchanges from TfL open data (2026-10-02). National Rail interchanges are listed where TfL groups the stations together.
Willesden Green has Metropolitan line platforms, but the timetable doesn't stop there. Trains call only when the Jubilee line isn't serving the station, so this diagram leaves it out.
Rolling stock
- S8 Stock since 2010
Earlier trains on this line
- Metropolitan Railway steam-hauled carriages 1863–1961
- Metropolitan Railway A and B Class locomotives 1864–1907
- Metropolitan Railway C to K Class locomotives 1891–1961
- Metropolitan Railway saloon stock 1905–1937
- Metropolitan Railway 'camel-back' and box-cab locomotives 1906–1922
- Metropolitan Railway 'Dreadnought' carriages 1910–1961
- F Stock 1920–1963
- Metropolitan-Vickers electric locomotives 1922–1961
- T Stock (Metropolitan MV/MW) 1927–1962
- O and P Stock (later CO/CP) 1937–1981
- A60 and A62 Stock 1961–2012
History 20
- The Metropolitan Railway opens from Paddington (Bishop's Road) to Farringdon Street, the world's first underground railway.
- The Metropolitan & St John's Wood Railway opens from Baker Street to Swiss Cottage.
- Extended to Harrow-on-the-Hill.
- Extended to Pinner, then to Rickmansworth on 1 September 1887.
- Extended to Chesham.
- Extended to Aylesbury.
- The branch from Harrow to Uxbridge opens.
- Electric trains begin, from Baker Street; they reach Uxbridge the same year.
- The name 'Metro-land' first appears in the railway's publicity.
- The Watford branch opens, electric from the start.
- The Stanmore branch opens; it passes to the Bakerloo in 1939.
- The Metropolitan Railway becomes part of the London Passenger Transport Board.
- The last trains run beyond Aylesbury to Verney Junction; the Brill branch had closed on 30 November 1935.
- Electric trains reach Amersham and Chesham. A Stock enters service from 1961.
- Metropolitan trains stop running north of Amersham, ending steam haulage of London Transport passenger trains.
- The first S8 Stock train enters service: the Underground's first air-conditioned, walk-through train.
- Through trains to Chesham replace the shuttle from Chalfont & Latimer.
- The last A Stock train runs in passenger service.
- Work on the Croxley Rail Link, to take Watford trains to Watford Junction, is not taken further after its costs overrun; the scheme is later discontinued.
- New signalling goes live from Finchley Road to Preston Road and Neasden depot. North of there, the old signals remain for now.
Sources 17
- Metropolitan line facts (archived), Transport for London, c. 2012 (length (66.7 km), 9.7 km underground, 34 stations, electrification, Watford branch, non-stop running beside the Jubilee)
- The Metropolitan line, London Transport Museum (34 stations, first underground railway, Metro-land)
- Key Dates in the History of London Transport (Corporate Archives Research Guide 4), Transport for London, 25 March 2023 (opening and extension dates, electrification, A and S8 Stock)
- Clive's UndergrounD Line Guides: Metropolitan line, Clive Feather (dated history, depots, shared track)
- Key facts: London Underground (archived), Transport for London, c. 2007 (Neasden depot)
- Poster: transfer of the Metropolitan Railway to the London Passenger Transport Board, London Transport Museum collection, 1933 (transfer to the London Passenger Transport Board)
- Metropolitan line Working Timetable No. 347 (archived), Transport for London, 12 January 2026 (22–23 trains an hour from Baker Street to Wembley Park, weekday peak, January 2026; Willesden Green stop code unused)
- Mayor's Question 2704/2011: Willesden Green (archived), London Assembly, 2011 (Metropolitan trains call at Willesden Green only during Jubilee closures)
- Last working day for the oldest train in town as roll-out of new state-of-the-art fleet is completed, Transport for London (press release), 26 September 2012 (A Stock from 1961, last service 26 September 2012)
- Commissioner's Report, Transport for London, November 2012 (whole fleet S8 Stock by November 2012)
- Metropolitan line extension (archived), Transport for London, c. 2017 (Croxley Rail Link funding gap)
- Metropolitan line extension, Three Rivers District Council (Croxley Rail Link discontinued, not progressed after 2018)
- Metropolitan line services cut during first week of June for major signalling upgrade, ianVisits, 28 May 2025 (signalling switchover, 31 May 2025)
- Investment Programme Report, Quarter 2 2025/26, TfL Programmes and Investment Committee, 11 December 2025 (signalling section delivered in Q1 2025/26)
- Mayor's Question 2022/0211: Tube usage (with TfL line boarder data), London Assembly, 18 February 2022 (93.7 million line boarders in 2019 (TfL data))
- TfL Colour Standard, issue 11, Transport for London, August 2026 (line colour: RGB 155/0/88)
- TfL Unified API: Line Route Sequence, Transport for London (Powered by TfL Open Data) (station order, zones and interchanges)
unverified Swiss Cottage opening, 13 April 1868 (Clive's guide; TfL's key dates give 1 April), Uxbridge branch opening, 4 July 1904 (Clive's guide; TfL's key dates give 1 January), signalling switchover, 31 May to 1 June 2025 (rail press; TfL's report confirms the quarter)