Metros and trams › Glasgow SubwayData updated
Glasgow Subway
The world's third-oldest underground railway, after London's and Budapest's: two parallel circular tunnels under the West End and the city centre, crossing the Clyde twice, with 15 stations. It opened in 1896 hauled by cable, was electrified in 1935, rebuilt from 1977 to 1980, and is being modernised again, with new Stadler trains, new signalling and platform screen doors. Its 4 ft gauge and 11 ft tunnels are unlike any other railway in Britain.
Facts
- Opened
- 14 December 1896
- Route
- A circle: the Outer Circle runs clockwise and the Inner Circle anticlockwise
- Type
- underground metro, circular
- Depots
- Broomloan
- Operating company
- Strathclyde Partnership for Transport (SPT), which owns it
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
4 cars, 130 ft (39.5 m)
Route 15 stations
Schematic, not to scale. Ringed stations are interchanges. The circle is drawn as a ring, clockwise from Buchanan Street at the top right; Outer Circle trains run clockwise, Inner Circle trains anticlockwise. Every train calls at every station; Partick is inside Partick Interchange, with ScotRail. Station order from SPT's Subway map (see Sources).
| Station | Interchanges |
|---|---|
| Buchanan Street | |
| St Enoch | |
| Bridge Street | |
| West Street | |
| Shields Road | |
| Kinning Park | |
| Cessnock | |
| Ibrox | |
| Govan | |
| Partick | ScotRail |
| Kelvinhall | |
| Hillhead | |
| Kelvinbridge | |
| St George's Cross | |
| Cowcaddens |
Stations from the operator’s published routes, entered by hand (see Sources).
Rolling stock
- Glasgow Subway Stadler trains since 2023
Earlier trains on this line
- Glasgow Subway Metro-Cammell trains 1980–2024
History 9
- Building starts, at St Enoch Square.
- The Subway opens to the public, its trains hauled by cables driven by a stationary steam engine.
- The Subway is electrified.
- It closes for a three-year modernisation: new trains, rebuilt stations and track, and ramps into Broomloan depot.
- It reopens, with Metro-Cammell's orange trains.
- SPT orders 17 four-car trains and new signalling from Stadler and Ansaldo STS.
- The first new train enters the tunnels for testing.
- The first new train carries passengers.
- From the end of June the new trains run the whole service, and the old ones are withdrawn.
Sources 8
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 8 sources from Strathclyde Partnership for Transport, Rail Engineer, Department for Transport and 1 more
- Subway maps and stations Strathclyde Partnership for Transport, accessed 10 October 202615 stations and their order; Outer and Inner Circles
- Partick Subway station: access guide Strathclyde Partnership for Transport, 2023 (its map data); accessed 10 October 2026Partick: the Subway station inside Partick Interchange, its concourse shared with ScotRail
- 125 years of the Subway (timeline) Strathclyde Partnership for Transport, 2021; accessed 10 October 2026dated history
- Subway Modernisation Strathclyde Partnership for Transport, accessed 10 October 2026modernisation, new trains, platform screen doors, Broomloan depot, journeys
- Clockwork orange reborn Rail Engineer (David Shirres), 28 November 20126.5-mile circular tunnels, 11 ft diameter, 4 ft gauge
- The Rail Vehicle Accessibility (Non-Interoperable Rail System) (Glasgow Subway) (Amendment Order) Exemption Order 2022: explanatory note Department for Transport, 2022gauge 4 ft 0 in (1,219 mm); tunnel diameter 11 ft 2 in (3,400 mm)
- METRO Glasgow EMU, Strathclyde Partnership for Transport (SPT), UK (data sheet MSPT0522e) Stadler, 2022600 V DC third rail; 4 ft 0 in (1,220 mm) gauge
- New Subway trains unveiled Strathclyde Partnership for Transport, 4 March 2016 (the page's byline says 9 March 2016)history
- Length: Rail Engineer gives 6.5 miles (10.5 km) for each circular tunnel; SPT's station page says "10 mile", and other sources give 6.2 miles (10 km) or 10.4 km
- The line colour: the orange of SPT's station signs, sampled from a photograph; SPT publishes no colour value
- Glasgow Corporation's take-over (1923 or 1935) and the renaming as the Glasgow Underground (1936 to 2003): Wikipedia only
- The 1977 closure date (21 March or 22 May 1977) and the reopening day (16 April 1980): sources differ
Know a source for one of these? Send it to us → (opens in a new tab)