Metros and trams › Sheffield SupertramData updated
Sheffield Supertram
Sheffield's tram network: 51 stops and 21 miles of route on four routes from the city centre to Middlewood and Malin Bridge in the north-west, Meadowhall in the Don Valley, and Halfway and Herdings Park in the south-east, with tram-trains running on over Network Rail's line to Rotherham. It opened in stages in 1994 and 1995. Stagecoach ran it from 1997 until March 2024, when it returned to public control. The tram-train line, Britain's first, opened in 2018.
Facts
- Opened
- 21 March 1994
- Routes to
- Middlewood, Malin Bridge, Meadowhall, Halfway, Herdings Park and, by tram-train, Rotherham Parkgate
- Type
- light rail: street tramway and reserved track, with tram-trains on to Network Rail's line to Rotherham
- Depots
- Nunnery, beside Nunnery Square stop
- Operating company
- South Yorkshire Future Trams Ltd, trading as Supertram, an arm's-length company wholly owned by the South Yorkshire Mayoral Combined Authority (SYMCA), which owns the tramway; in public hands since 22 March 2024, after 27 years of Stagecoach operation
- Shares track
- The Tram Train route only: Network Rail's line from Tinsley, joined by a short new chord beyond Meadowhall South, through Magna and Rotherham Central to Parkgate, used by main-line trains too. It is electrified at the tramway's 750 V DC for the tram-trains, which were specified as dual-voltage, to take 25 kV AC too if the main line is electrified. It was the first service in Britain to run on both a street tramway and the national rail network.
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
3 sections, about 114 ft (35 m)
3 cars, about 122 ft (37 m)
Route 51 stops
Blue route: Malin Bridge – Halfway 33
Yellow route: Middlewood – Meadowhall Interchange 25
Purple route: Herdings Park – Cathedral 14
Tram Train: Parkgate – Cathedral 15
Schematic, not to scale. Ringed stops are interchanges. One strip for each of the four routes, in its own colour. All four run through the city centre, by Cathedral, Castle Square and Fitzalan Square, and they share track beyond it in pairs: the Blue and Yellow to Hillsborough, the Blue and Purple to Gleadless Townend, and the Yellow and Tram Train to Meadowhall South. Ringed stops are those the operator's map marks for changing routes, and those beside a National Rail station. From Meadowhall South the tram-trains leave the tramway for Network Rail's line through Magna and Rotherham Central to Parkgate. The Purple route runs about once an hour, the Tram Train about every 30 minutes. Stop order from the operator's network map and timetables (see Sources).
| Stop | Interchanges |
|---|---|
| Malin Bridge | |
| Hillsborough | Other Supertram routes |
| Bamforth Street | |
| Langsett/Primrose View | |
| Infirmary Road | |
| Shalesmoor for Kelham Island | |
| Netherthorpe Road | |
| University of Sheffield | |
| West Street | |
| City Hall | |
| Cathedral | Other Supertram routes |
| Castle Square | |
| Fitzalan Square | Other Supertram routes |
| Sheffield Station | National Rail |
| Granville Road | |
| Park Grange Croft | |
| Park Grange | |
| Arbourthorne Road | |
| Spring Lane | |
| Manor Top | |
| Hollinsend | |
| Gleadless Townend | Other Supertram routes |
| White Lane | |
| Birley Lane | |
| Birley Moor Road | |
| Hackenthorpe | |
| Donetsk Way | |
| Moss Way | |
| Crystal Peaks | |
| Drake House Lane | |
| Waterthorpe | |
| Westfield | |
| Halfway | |
| Middlewood | |
| Leppings Lane | |
| Hillsborough Park | |
| Hyde Park | |
| Cricket Inn Road | |
| Nunnery Square | |
| Woodbourn Road | |
| Attercliffe | |
| Arena | |
| Valley Centertainment | |
| Carbrook | |
| Meadowhall South | Other Supertram routes |
| Meadowhall Interchange | National Rail |
| Herdings Park | |
| Herdings/Leighton Road | |
| Parkgate | |
| Rotherham Central | National Rail |
| Magna |
Stops from the operator’s published routes, entered by hand (see Sources).
Rolling stock
- Siemens-Duewag Supertram since 1994
- Class 399 Citylink since 2017
History 22
- Sheffield's last first-generation tram runs.
- After a transport study in the early 1970s, the South Yorkshire Passenger Transport Executive (SYPTE) and South Yorkshire County Council deposit a Bill in Parliament for a light rail system.
- Parliament passes the South Yorkshire Light Rail Transit Act 1988, the first of the Acts authorising the system; more follow in 1989, 1990 and 1993.
- Construction begins, the line to Meadowhall first: off the street once out of the city centre, much of it on the alignment of a freight railway.
- Supertram opens, from Fitzalan Square in the city centre to Meadowhall, run by South Yorkshire Supertram Ltd, a company owned by SYPTE.
- Trams run from Fitzalan Square to Spring Lane.
- The line is extended from Spring Lane to Gleadless Townend.
- Trams reach Cathedral from Fitzalan Square.
- The line is extended from Cathedral to Shalesmoor.
- The line from Gleadless Townend reaches Halfway.
- The branch from Gleadless Townend to Herdings Park opens.
- The last lines open, from Shalesmoor to Middlewood and Malin Bridge, completing the network.
- SYPTE sells South Yorkshire Supertram Ltd to Stagecoach for £1.15 million, with the concession to run and maintain the tramway until 2024; SYPTE keeps the track and infrastructure.
- The government chooses Sheffield to Rotherham for a pilot of tram-trains, to run from the tramway on to the national rail network.
- The Treasury approves the tram-train pilot.
- Work begins on a £32 million programme to replace worn-out track across the network, starting on Park Grange Road.
- The tram-train pilot opens: Britain's first tram-trains enter service between Sheffield and Rotherham, leaving the tramway beyond Meadowhall South by the new Tinsley Chord for Network Rail's line to Rotherham Parkgate.
- SYMCA votes to bring Supertram back under public control when Stagecoach's contract ends in March 2024, with a £100 million government grant to renew it.
- Supertram returns to public control after 27 years of Stagecoach operation, run by South Yorkshire Future Trams Ltd, a company owned by SYMCA.
- A renewal programme begins, replacing rails and overhead line equipment more than 30 years old.
- Magna opens on the tram-train line, between Meadowhall South and Rotherham Central, with a park and ride: the first new stop since 2018.
- The delta junction at Park Square, where the lines to Meadowhall, Halfway and the city centre meet, is renewed after 32 years, in a £3.5 million project.
Sources 20
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 20 sources from British Trams Online, Travel South Yorkshire, for Supertram, Rail Accident Investigation Branch and 8 more
- Light rail and tram statistics (LRT): data tables Department for Transport, 29 September 2026 (the year ending March 2026)Sheffield Supertram: 8.5 million journeys in the year to March 2026 (LRT0101); 50 stops (LRT0201); 32 trams (LRT0202); 34.0 route km and 21.1 route miles (LRT0203, LRT0204)
- Supertram Network Map (with Key) Supertram (South Yorkshire Future Trams Ltd), April 2026the four routes and their stops in order; the stops to change routes; the National Rail interchanges; the route colours
- Tram & Tram Train Guide: All Routes, valid from 14 December 2025 Travel South Yorkshire (South Yorkshire Mayoral Combined Authority), for Supertram, December 2025the four routes, their termini and frequencies; the stops in order
- Tram Train timetable, valid from 09 April 2026 Travel South Yorkshire (South Yorkshire Mayoral Combined Authority), for Supertram, April 2026the Tram Train route's stops, with Magna, and its frequency
- Report 10/2026: Collision between a tram and two pedestrians at Staniforth Road, Sheffield, 22 June 2025 Rail Accident Investigation Branch (RAIB), July 2026the Yellow and Purple routes' ends; 750 V DC overhead; SYMCA owns the infrastructure, South Yorkshire Future Trams Ltd operates and maintains it, after South Yorkshire Supertram Ltd before March 2024; Nunnery Road depot
- Report 13/2017: Fatal collision between a tram and a pedestrian, Woodbourn Road, Sheffield, 22 December 2016 Rail Accident Investigation Branch (RAIB), September 2017750 V DC overhead; the depot next to Nunnery Square stop
- South Yorkshire Future Trams Limited: financial statements for the period ended 31 March 2025 (unaudited) South Yorkshire Mayoral Combined Authority, 2025the operator, its ownership and its start on 22 March 2024; four routes, 32 trams, a 28 km network
- The Sheffield to Rotherham tram-train project: investigation into the modification of the national rail network National Audit Office, July 2017the tram-train line on Network Rail's track; 750 V DC on both the tramway and the national rail section; dual-voltage tram-trains for a future 25 kV AC
- Sheffield Supertram: history thetrams.co.uk, undated, read 11 October 2026history
- South Yorkshire Light Rail Transit Act 1993 (1993 c. ii), as enacted legislation.gov.uk (The National Archives), 18 February 1993history
- The Completely Random A-Z of Trams in the British Isles! S is for Supertram British Trams Online, 25 December 2023history
- Public control of Supertram confirmed from March 2024 British Trams Online, 25 October 2022history
- Supertram rail replacement work nears completion British Trams Online, 25 October 2013history
- Essential rail replacement section for Stagecoach Supertram completed VolkerRail, undated, read 11 October 2026history
- UK's first tram train debuts in South Yorkshire Network Rail, 25 October 2018history
- Could Supertram come under public control again? British Trams Online, 13 October 2022history
- New trams for Supertram as it returns to public control? British Trams Online, 22 March 2024history
- Magna Tram-Train station to open 9th April British Trams Online, 29 March 2026history
- In Pictures: A look around the new Magna tramstop British Trams Online, 17 April 2026history
- Supertram Engineering Works: 8th to 31st August 2026 British Trams Online, 4 August 2026history
- The 1994 and 1995 openings: the dates of the stages from one enthusiasts' reference site (thetrams.co.uk); British Trams Online agrees on the first (21 March 1994) and the last (23 October 1995). No SYPTE or SYMCA source found
- 1960, 1985 and 1991 (the last old tram, the first Bill and the start of construction): thetrams.co.uk only
- Stagecoach's purchase in 1997 (thetrams.co.uk: "at the end of 1997", for £1.15 million); British Trams Online says Stagecoach ran it from 1997
- Route length: the DfT's 34.0 km (21.1 miles) for the year to March 2026, counting the tram-train line; the operator's 2024-25 accounts give "a 28km light rail network", which may leave out Network Rail's line
- 51 stops: Kyle's April 2026 map, and the operator's own home page ("four tram routes serving 51 stops", read 11 October 2026; the page has no saved copy, as the site blocks automated downloads); the DfT counts 50 for the year to March 2026, before Magna opened
- Stop names: the April 2026 map's large print; the operator's tram guide gives some longer ("Fitzalan Square / Ponds Forge", "Arena / Olympic Legacy Park", "Meadowhall South / Tinsley", "Beighton / Drake House Lane", "Rotherham Parkgate")
- The depot: "the depot next to Nunnery Square tram stop" (RAIB, 2017); "Nunnery Road depot" (RAIB, 2026)
- The route colours: sampled from the April 2026 map as rendered, not published values; the system's colour is the Blue route's
Know a source for one of these? Send it to us → (opens in a new tab)