National Rail › MerseyrailData updated
Merseyrail
Liverpool's suburban electric railway: the Northern and Wirral lines, joined under the city centre by tunnels opened in 1977, with third-rail trains to Southport, Ormskirk, Headbolt Lane, Hunts Cross, New Brighton, West Kirby, Chester and Ellesmere Port. Serco and Transport UK have run it since 2003 under a concession from Merseytravel rather than the Department for Transport, and it is due to pass into public ownership in July 2028. Its Stadler Class 777 trains belong to the Combined Authority; seven carry batteries to run beyond the third rail to Headbolt Lane.
Facts
- Current operator since
- 20 July 2003
- Main stations
- Liverpool Central
- Type
- Suburban electric train operator
- Depots
- Kirkdale, Liverpool (Stadler), Birkenhead North (Stadler)
- Main routes
- Two lines that meet under Liverpool city centre. The Northern line: Liverpool Central to Southport via Bootle and Formby, and Hunts Cross via Liverpool South Parkway to Ormskirk and to Headbolt Lane via Kirkby, through the Link tunnel and Moorfields. The Wirral line: round a one-way loop under the city centre (James Street, Moorfields, Lime Street and Liverpool Central), under the Mersey to Birkenhead, and on to New Brighton, West Kirby, Chester and Ellesmere Port.
- Stations managed
- 67
- Operating company
- Merseyrail Electrics 2002 Ltd, a 50/50 joint venture of Serco and Transport UK (formerly Abellio UK). It runs the trains under a 25-year concession let by Merseytravel, the transport executive of the Liverpool City Region Combined Authority, from 20 July 2003 to July 2028: a local contract, not a Department for Transport franchise. The Combined Authority owns the trains. On 17 July 2026 it decided that the railway will pass into public ownership when the concession ends.
Routes 7 routes · 69 stations
Liverpool Central – Southport 17
Ormskirk – Hunts Cross 19
Liverpool Central – Chester 18
Liverpool Central – Ellesmere Port 18
Liverpool Central – West Kirby 15
Headbolt Lane – Hunts Cross 14
Liverpool Central – New Brighton 11
Schematic, not to scale. Ringed stations are interchanges. Each strip is one service route with its stops in order. Where fast and stopping trains share a route, the strip shows the one with most stops, and a route whose stops all lie on a longer one is left out. Station order from TfL open data.
| Station | Zone | Interchanges |
|---|---|---|
| Liverpool Central | ||
| Moorfields | ||
| Sandhills | ||
| Bank Hall | ||
| Bootle Oriel Road | ||
| Bootle New Strand | ||
| Seaforth & Litherland | ||
| Waterloo (Merseyside) | ||
| Blundellsands & Crosby | ||
| Hall Road | ||
| Hightown | ||
| Formby | ||
| Freshfield | ||
| Ainsdale | ||
| Hillside | ||
| Birkdale | ||
| Southport | ||
| Ormskirk | ||
| Aughton Park | ||
| Town Green | ||
| Maghull North | ||
| Maghull | ||
| Old Roan | ||
| Aintree | ||
| Orrell Park | ||
| Walton (Merseyside) | ||
| Kirkdale | ||
| Brunswick | ||
| St Michaels | ||
| Aigburth | ||
| Cressington | ||
| Liverpool South Parkway | ||
| Hunts Cross | ||
| Liverpool Lime Street | ||
| Liverpool James Street | ||
| Birkenhead Hamilton Square | ||
| Birkenhead Central | ||
| Green Lane | ||
| Rock Ferry | ||
| Bebington | ||
| Port Sunlight | ||
| Spital | ||
| Bromborough Rake | ||
| Bromborough | ||
| Eastham Rake | ||
| Hooton | ||
| Capenhurst | ||
| Bache | ||
| Chester | ||
| Little Sutton | ||
| Overpool | ||
| Ellesmere Port | ||
| Conway Park | ||
| Birkenhead Park | ||
| Birkenhead North | ||
| Bidston | ||
| Leasowe | ||
| Moreton (Merseyside) | ||
| Meols | ||
| Manor Road | ||
| Hoylake | ||
| West Kirby | ||
| Headbolt Lane | ||
| Kirkby | ||
| Fazakerley | ||
| Rice Lane | ||
| Wallasey Village | ||
| Wallasey Grove Road | ||
| New Brighton |
Stations, zones and interchanges from TfL open data (2026-10-07). National Rail interchanges are listed where TfL groups the stations together.
Fleet
| Class | Units | Formation and notes |
|---|---|---|
| Class 777 | 53 | four-car articulated units: 46 Class 777/0 and seven battery Class 777/1; up to two run together as eight cars; owned by the Liverpool City Region Combined Authority and maintained by Stadler |
History 10
- The Mersey Railway opens from James Street in Liverpool to Green Lane in Birkenhead, in the first tunnel built under a tidal estuary. It runs on steam until 3 May 1903, when electric trains take over.
- The Link tunnel opens: trains from Southport, Ormskirk and Kirkby run through Moorfields to the new Liverpool Central instead of terminating at Exchange, which closes. A week later, on 9 May, the Wirral line's one-way Loop under the city centre opens, by way of Lime Street.
- The Queen officially opens the Merseyrail network, riding a new Class 507 from Moorfields to Kirkby. The Class 507s carry passengers from 1 November; with the similar Class 508s, they run the network for the next 46 years.
- Serco and NedRailways (later Abellio, now Transport UK) take over the trains under a 25-year concession from Merseytravel worth about £3.6 billion, covering 66 stations and two depots.
- Merseytravel signs with Stadler for 52 new trains and their maintenance over 35 years, up to £700 million in all, with a new depot at Kirkdale. The trains are bought outright rather than leased.
- Maghull North station opens on the Ormskirk line.
- The first Class 777 carries passengers, from Liverpool Central to Kirkby.
- Headbolt Lane station opens beyond Kirkby, the first extension of the network in 29 years, served by Class 777s running on batteries over the 1.3 km past the end of the third rail.
- The last Class 507s carry passengers; regular 507 and 508 workings had ended on 25 August, when eight-car Class 777 trains took over the Southport line.
- The Combined Authority decides that Merseyrail's trains will pass into public ownership when the concession ends in July 2028, rather than extend it to 2031 or let a new one.
Sources 30
- TOC key statistics: Merseyrail, April 2025 to March 2026, Office of Rail and Road, 6 August 2026 (122 route km, 67 stations managed, 31.5 million journeys, 2025–26)
- Table 6314: rolling stock vehicles by traction type and operator, Office of Rail and Road, 20 November 2025 (Merseyrail's 212 electric vehicles (53 four-car units), March 2025)
- Corporate information, Merseyrail, accessed 7 October 2026 (Merseyrail Electrics (2002) Ltd, a 50/50 joint venture of Serco and Transport UK; 25-year concession with Merseytravel; 69 stations reached, 68 its own)
- Merseytravel, Merseyrail, accessed 7 October 2026 (concession started 20 July 2003, managed by Merseytravel; trains bought and owned by the Combined Authority)
- MERSEYRAIL ELECTRICS 2002 LIMITED, company number 04356933, Companies House, accessed 7 October 2026 (Merseyrail Electrics 2002 Limited, incorporated 21 January 2002)
- About Transport UK, Transport UK (Transport UK, formerly Abellio UK)
- Serco joint venture selected as preferred bidder for £3.6 billion Merseyrail Electric network concession, Serco Group plc (via Investegate), 23 April 2003 (Serco and NedRailways preferred bidder; £3.6 billion over 25 years from 20 July 2003; 66 stations, two depots)
- Serco joint venture signs contract: £3.6 billion Merseyrail Electrics network concession, Serco Group plc (via Investegate), 23 May 2003 (contract signed, May 2003)
- Metro Network Update (report to the Combined Authority, 17 July 2026), Liverpool City Region Combined Authority, 17 July 2026 (concession ends July 2028; the operator's offer of an extension to July 2031; recommendation of public ownership, meeting of 17 July 2026; Merseytravel the contracting authority)
- Mayor sets out plan to take back public control of Merseyrail, Merseytravel, 9 July 2026 (plan for public control from 2028 announced 9 July 2026)
- Merseyrail to be brought back into public control, Birkenhead News, 17 July 2026 (the Combined Authority's decision, July 2026)
- Train times: Northern Line, valid from 17 May 2026, Merseytravel, May 2026 (Northern line services from 17 May 2026: Liverpool to Southport; Hunts Cross to Ormskirk and Headbolt Lane)
- TfL Unified API: Line Route Sequence, Transport for London (Powered by TfL Open Data) (routes and station order)
- Liverpool Central Low Level, Subterranea Britannica (Nick Catford), accessed 7 October 2026 (Mersey Railway opened 20 January 1886, electric from 3 May 1903; Link opened 2 May 1977 and Loop 9 May 1977)
- Rail Reinvention in Liverpool Part 1: Merseyrail Electrics, National Railway Museum blog, accessed 7 October 2026 (Loop and Link opened May 1977; Merseyrail officially opened 25 October 1978; Class 507s and 508s)
- Class act in the cavern (Mersey Loop track renewal), Rail Engineer, 31 July 2017 (the Loop and Link built 1972 to 1977; the Loop a one-way single-bore tunnel from James Street)
- About, Class 507 Preservation Society, accessed 7 October 2026 (the Queen's journey of 25 October 1978; first 507 passenger service 1 November 1978)
- Merseyside's Royal Train departs for preservation, Class 507 Preservation Society, 2 January 2025 (regular 507 workings ended 25 August 2024; last passenger working 28 November 2024)
- Farewell tour for old Merseyrail fleet, Merseyrail, 2024 (507 farewell tours, 2024; leased from Angel Trains)
- Merseyrail offers a swansong tour for Class 507s, RAIL, 6 September 2024 (Wirral Swansong tour, 15 September 2024)
- Stadler signs contract to build and maintain 52 metro trains for Liverpool City Region (media release), Stadler, 16 February 2017 (contract for 52 trains and 35 years' maintenance, up to £700 million; Kirkdale depot; option for 60 more)
- Mersey Electrics Class 777 and system upgrade, Rail Engineer (Malcolm Dobell), 23 February 2023 (trains funded without a leasing company; first in service 23 January 2023; 53 units, seven with batteries; Kirkdale depot)
- Metro Mayor hails improved rail links at Maghull North station official opening, Merseytravel, 22 June 2018 (Maghull North's first train, 18 June 2018)
- First new Merseyrail train joins network, BBC News, 23 January 2023 (first Class 777 passenger service, 23 January 2023, Liverpool Central to Kirkby)
- Rail history made yet again as Mayor hails the launch of the UK's first battery powered trains in the Liverpool City Region, Merseytravel, 5 October 2023 (Headbolt Lane opened with battery trains, 5 October 2023; first extension in 29 years; seven battery units)
- Headbolt Lane station opens with battery train service, Railway Gazette International, October 2023 (opened 5 October 2023; 1.3 km beyond the third rail at Kirkby)
- Five months on: how UK's first battery-powered trains are faring at Headbolt Lane, RAIL, 27 February 2024 (seven Class 777/1s; opening given as 6 October 2023)
- Rolling Stock Class 777 Moves (notice 2021/S 000-004880), Find a Tender (Merseytravel), 10 March 2021 (Stadler's maintenance depots at Kirkdale and Birkenhead North)
- Merseyrail website (home page and style sheet), Merseyrail, accessed 7 October 2026 (brand yellow #FFEB37)
- TfL Unified API: Line Route Sequence, Transport for London (Powered by TfL Open Data) (main stations: the stations most of its routes meet at, counted from TfL's route data)
unverified route strips: since at least October 2025 Southport trains start at Liverpool Central and the Hunts Cross trains run to Ormskirk and Headbolt Lane (Merseytravel's timetables); TfL's data still has a Hunts Cross to Southport route, so it is left out and the Southport line is drawn from Liverpool Central in TfL's station order, stations: 69 counted from TfL's route data (Merseyrail says its network reaches 69 stations, and 68 of its own); ORR counts 67 managed, which leaves out Liverpool Lime Street (Network Rail) and presumably Chester, Headbolt Lane's opening date: Merseytravel's release and Railway Gazette give 5 October 2023; RAIL (February 2024) gives 6 October, the last day of the Class 507s comes from the Class 507 Preservation Society, an enthusiast group; Merseyrail and RAIL confirm only the September 2024 farewell tour, the battery units: Stadler and Rail Engineer give seven, with 320 kWh; their unit numbers (777140 to 777152, even numbers) are from Wikipedia, depots: Merseytravel's 2021 tender names Kirkdale and Birkenhead North as Stadler's maintenance depots; which work is done at each isn't stated