National Rail › Gatwick ExpressData updated
Gatwick Express
Non-stop trains between London Victoria and Gatwick Airport, running on to Haywards Heath and Brighton; the fastest take 31 minutes from London. It began under British Rail in 1984, has run only Class 387/2 Electrostars since 2016 and has been publicly owned since May 2026.
Facts
- Current operator since
- 31 May 2026
- London terminals
- London Victoria
- Type
- Airport express train brand
- Depots
- Lovers Walk (Brighton)
- Main routes
- Non-stop between London Victoria and Gatwick Airport twice an hour, with trains running on to Haywards Heath and Brighton; four trains an hour between Victoria and Gatwick are promised from December 2026.
- Stations managed
- 236, for all of GTR (Thameslink, Southern, Great Northern and Gatwick Express)
- Operating company
- Thameslink Southern Great Northern Ltd, owned by DfT Operator (public ownership since 31 May 2026). It runs Gatwick Express with Thameslink, Southern and Great Northern as the Greater Thameslink Railway (GTR).
Routes 1 routes · 4 stations
Schematic, not to scale. Ringed stations are interchanges. Each strip is one service route with its stops in order. Where fast and stopping trains share a route, the strip shows the one with most stops, and a route whose stops all lie on a longer one is left out. Station order from TfL open data.
| Station | Zone | Interchanges |
|---|---|---|
| London Victoria | 1 | Circle, District, Victoria |
| Gatwick Airport | ||
| Haywards Heath | ||
| Brighton |
Stations, zones and interchanges from TfL open data (2026-10-06). National Rail interchanges are listed where TfL groups the stations together.
Fleet
| Class | Units | Formation and notes |
|---|---|---|
| Class 387 Electrostar | 27 | four-car Class 387/2s, bought for Gatwick Express; GTR runs them in a pool of 46 Class 387s shared with Southern |
History 10
- British Rail's Gatwick Express carries its first passengers: non-stop trains from Victoria, with Class 73 locomotives, refurbished Mark 2 coaches and luggage vans, advertised as taking 30 minutes.
- National Express takes over Gatwick Express, one of the first franchises let at privatisation.
- The first of eight Alstom Class 460 Juniper trains, ordered by National Express, enters service.
- Gatwick Express stops being a separate franchise and becomes part of Southern; some peak trains run on to Brighton.
- Refurbished Class 442s from South West Trains start replacing the Class 460s, which have all gone by September 2012.
- Southern and Gatwick Express join Govia Thameslink Railway's Thameslink, Southern and Great Northern franchise.
- The first Class 387/2 in Gatwick Express colours carries passengers between Victoria and Gatwick.
- The last of the 27 Class 387/2s takes over, and the Class 442s leave Gatwick Express.
- Non-stop trains return after the pandemic, two an hour instead of four, running on to Brighton from Monday to Saturday; they had been suspended since 30 March 2020.
- Gatwick Express passes into public ownership with the rest of GTR.
Sources 24
- TOC key statistics: Govia Thameslink Railway, April 2025 to March 2026, Office of Rail and Road, 6 August 2026 (all of GTR: 1,149 route km, 236 stations managed, 316 million journeys, 2025–26)
- Table 6314: rolling stock vehicles by traction type and operator, Office of Rail and Road, 20 November 2025 (GTR's 2,531 electric and 47 diesel vehicles, March 2025)
- Transfer of Govia Thameslink Railway's services into public ownership, Department for Transport, 1 June 2026 (public ownership, TSGNL, twice as many Gatwick Express trains an hour from December 2026)
- Britain's biggest train operator's services enter public ownership this weekend, Department for Transport, 28 May 2026 (public ownership from 31 May 2026)
- Company information, Gatwick Express, 2026 (trading name of TSGNL, owned by DfT Operator)
- GTR highlights improvements delivered during its first 100 days under public ownership, GTR, 11 September 2026 (the name Greater Thameslink Railway; extra summer trains)
- About us, Gatwick Express, 2026 (founded 1984, part of Southern from 2008, part of GTR from 2015)
- Timetables, Gatwick Express, 2026 (two trains an hour; route via Gatwick Airport and Haywards Heath to Brighton)
- Gatwick Express home page (journey time) and site stylesheet (brand red), Gatwick Express, read 6 October 2026 (fastest journey 31 minutes from London; brand red)
- From bed to 'boarding now': Gatwick Express taps into pyjama travel trend with new early morning and overnight trains, GTR, 16 July 2026 (direct 30-minute services between Victoria and Gatwick)
- Gatwick Express launches limited edition 'ruby' waistcoats to celebrate 40th anniversary, GTR, 14 May 2024 (opened to the public on 14 May 1984)
- Gatwick Express: The 40th anniversary of British Rail's "supertrain", IanVisits, 7 May 2024 (1984 launch, National Express from April 1996)
- Gatwick Express service 1984-2001, Southern Electric Group (sremg.org.uk) (1984 to 2001 locomotive-hauled stock)
- Class 460 "Gatwick Express", Southern Electric Group (sremg.org.uk) (Class 460 first in service 22 September 2000)
- "Catch the train and you've caught the plane" (RAIL 750), RAIL, 11 June 2014 (history to 2014: National Express, Class 460s and 442s, merger into Southern)
- Interim results for the six months ended 30 June 2008, National Express Group PLC, 31 July 2008 (handover to Southern in June 2008)
- New rail franchising deal set to transform passenger services across London and the South East, Department for Transport, 23 May 2014 (South Central (Southern and Gatwick Express) joins the TSGN franchise in July 2015; 108 new carriages)
- New Gatwick Express trains take off, Railnews, 11 March 2016 (first Class 387/2 in service 29 February 2016)
- GTR renews entire Gatwick Express train fleet, GTR, 27 September 2016 (fleet of 27 Class 387/2s (108 carriages) complete, replacing the Class 442s)
- Southern and Gatwick Express trains win reliability prizes, GTR, 28 November 2019 (Lovers Walk depot, Brighton, maintains the 27 Class 387/2s)
- GTR helps GWR in wake of cracks found on Class 800s, GTR, 13 July 2021 (Gatwick Express suspended in the pandemic; six 387/2s lent to GWR and six to Great Northern)
- Gatwick Express returns for spring to support airport recovery, GTR, 16 March 2022 (suspended 30 March 2020; back from 3 April 2022 at two trains an hour)
- Govia Thameslink Railway begins cascade of Class 377s and 387s, Rail, 13 February 2025 (27 Class 387/2s on Gatwick Express; GTR's 387s shared with Southern from 2025)
- TfL Unified API: Line Route Sequence, Transport for London (Powered by TfL Open Data) (routes and station order)
unverified the 27 Class 387/2s as Gatwick Express's fleet in 2026: last stated by RAIL in February 2025; GTR runs its Class 387s across Gatwick Express and Southern, and Wikipedia lists five 387/2s (387201 and 387205 to 387208) with Southern, stabling at Stewarts Lane, Battersea (Wikipedia), the exact handover date of 22 June 2008 (Wikipedia); National Express says only that it handed over in June 2008, whether every train runs on to Brighton, including on Sundays: Gatwick Express's timetable page gives the route as Victoria, Gatwick Airport, Haywards Heath and Brighton, but in 2022 Sunday trains ran only between Victoria and Gatwick, route strip: TfL's route data lists 12 stations between Victoria and Brighton; only the four Gatwick Express publishes as its calls are drawn