Stations › London termini › Waterloo
Waterloo
The London and South Western Railway’s terminus, opened in 1848 and rebuilt between 1900 and 1922, with 24 platforms. Platforms 20 to 24 were Eurostar’s London terminal until 2007.
Facts
- Opened
- 11 July 1848, as Waterloo Bridge, by the London and South Western Railway, replacing the Nine Elms terminus
- Platforms
- 24, numbered 1 to 24, all terminal. Platforms 20 to 24 were Waterloo International’s, closed in 2007 and reopened in 2018–19
- Routes
- South Western Main Line; the West of England line; the Portsmouth Direct line; the Reading line; south-west London’s suburban lines. Route names from Wikipedia only
- Operators
- South Western Railway
- Underground
- Bakerloo Jubilee Northern Waterloo & City
- Next door
- Waterloo East (Southeastern), a separate station
- Roof
- Ridge-and-furrow over the main station, from the 1900–22 rebuild; platforms 20 to 24 under Nicholas Grimshaw’s glazed international trainshed, 1,312 ft (400 m) long, completed in 1993
- Architect
- J. R. Scott (offices and the Victory Arch) with J. W. Jacomb-Hood (chief engineer); sculpture by Charles Whiffen; the international terminal by Nicholas Grimshaw
- Listed
- The Victory Arch only, Grade II (Historic England, entry 1063898). A Network Rail press release says Grade I
- Interchanges
- 4.46 million (2024-25)
- Managed by
- Network Rail
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
Where trains go
Waterloo’s routes follow the railway out of London, then split to the parts of the country they reach, set at their compass bearings; point at a line to see who runs it. The other termini are the small dots; select one to open its page. Distances are true at the circle’s edge, 6 miles (10 km) out, and stretched towards the middle so the termini have room. The route colour is the map’s own: not official, and not any operator’s livery. All 13 together: the map on the Maps page.
Platforms 24
Seen from above, to scale: the platforms, tracks and the station building’s outline (the grey line) from OpenStreetMap, the buffer stops on the left and the platforms running out to the south-south-west (north is marked top left). Platforms 20 to 24, along the west side, curve away under the former international shed.
Trains
- Class 701 Arterio South Western Railway
- Class 444 Desiro South Western Railway
- Class 450 Desiro South Western Railway
- Class 458 Juniper South Western Railway
- Class 159 South Western Turbo South Western Railway
- Class 158 Express Sprinter South Western Railway
Each of these trains’ records names Waterloo.
History 7
- Opens as Waterloo Bridge, with six platforms, replacing Nine Elms.
- Rebuilt by the London and South Western Railway, with 21 platforms.
- Formally opened by Queen Mary, with the Victory Arch to those who fell in the First World War.
- Waterloo International’s trainshed is completed, and Eurostar starts running from it.
- The Victory Arch is listed, Grade II.
- Eurostar moves to St Pancras and the international platforms close.
- Platforms 20 to 22 reopen for South Western Railway in December 2018, and 23 and 24 in May 2019.
Sources 9
Show the 9 sources from Network Rail, Wikipedia, Office of Rail and Road and 3 more
- Network Rail celebrates London Waterloo's 175th anniversary Network Rail, 2023opening date and company, opened
- London Waterloo station's Victory Arch rededicated 100 years after it was built Network Rail, 2022today's building, the rebuild, its opening
- London Waterloo: station page Network Railplatforms, operators, connections
- London Waterloo station Wikipediaroutes, route names only
- Table 1410: passenger entries and exits and interchanges by station, April 2024 to March 2025 (with each station's facility owner) Office of Rail and Road, 4 December 2025who manages it, entries and exits, interchanges and rank, entries, exits, interchanges, rank
- Obituary: Sir Nicholas Grimshaw, 1939-2025 RIBA Journal, 2025the train shed, the international trainshed
- The history of London Waterloo station Network Railarchitect, architects
- National Heritage List for England, entry 1063898 Historic Englandlisting, the street front, the Victory Arch
- Platforms, tracks and station outlines of the London termini (Overpass API extracts) OpenStreetMap contributors, 10 October 2026the plan
Where the sources disagree:
- Rebuild dates: 1900-1922 (Network Rail) vs 1903-1922 (Wikipedia).
- Grimshaw trainshed completion 1993 (RIBA Journal, archiweb) vs opened November 1994 (Londonist; Network Rail says 1994): both fit, one is completion, one is opening to traffic.
- Network Rail's Waterloo history page summary calls the 1848 station 'Central station'; the 175th-anniversary release calls it Waterloo Bridge. Waterloo Bridge recorded.