Stations › Other London stations › Elephant & Castle
Elephant & Castle
A station of 1862 on the London, Chatham and Dover Railway’s Metropolitan Extension, carried on a brick viaduct, where Thameslink and Southeastern trains call above the Bakerloo and Northern line station of the same name.
Platforms 4
Seen from above, to scale: the platforms, tracks and the station building’s outline (the grey line) from OpenStreetMap, the lines running roughly north to south. North is marked top left, and the scale bottom left. Point at a platform for its number and length.
Facts
- Opened
- 6 October 1862 by the London, Chatham and Dover Railway as a temporary terminus; a permanent structure followed in February 1863
- Platforms
- 4, numbered 1 to 4, on a brick viaduct, two of them on an island between the lines
- Routes
- Thameslink between Blackfriars and Herne Hill, with the Sutton Loop and Sevenoaks services, and a few Southeastern peak trains
- Underground
- Bakerloo Northern
- Operators
- Thameslink, Southeastern
- Access
- Stairs only; National Rail step-free category C (no step-free access to the platforms)
- Managed by
- Thameslink
- Listed
- No listing found (not confirmed)
- Interchanges
- 0.44 million (2024-25)
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
Trains
- Class 700 Desiro City Thameslink
The trains the operators run here, as the sources give them.
History 10
- The London, Chatham and Dover Railway opens the station as the terminus of the first section of its Metropolitan Extension from Herne Hill, with two timber-planked platforms under a trainshed.
- Quadrupling of the line from Herne Hill to Blackfriars is completed; the station gains two more platform faces on a parallel viaduct.
- The City and South London Railway opens its station below, now the Northern line’s.
- The Baker Street and Waterloo Railway, now the Bakerloo line, opens its Elephant & Castle station as its southern terminus.
- Public electric services begin on the Holborn Viaduct to Orpington route via Herne Hill, on the Southern Railway’s 660-volt third-rail system.
- An air raid burns out the 1862 trainshed and signal box and destroys the platform 1 canopy.
- Repairs begin: new 120-foot canopies go on all platforms and the platforms are rebuilt in prefabricated concrete.
- The Elephant and Castle Shopping Centre opens beside the station, with a footbridge giving a direct link to the platforms.
- Thameslink services begin, including Cricklewood to Sevenoaks, which run over this route.
- A fire in the railway arches below fills the station with smoke and the station and line close for a time; the station itself is not damaged.
Sources 11
Show the 11 sources from Kent Rail, Wikipedia, Office of Rail and Road and 6 more
- Table 1410: passenger entries and exits and interchanges by station, April 2024 to March 2025 (with each station's facility owner) Office of Rail and Road, 4 December 2025entries and exits, interchanges and rank (ORR’s name for the station is ‘Elephant and Castle’)
- Longer platforms on the way to allow new Class 700 trains on Sutton Thameslink route Network Rail, 11 July 2016Class 700 on the Sutton Thameslink route (cited from the Wimbledon research; that this route serves Elephant & Castle is from Wikipedia)
- Elephant & Castle (EPH) station information National Rail Enquiries, 20 October 2026station name and code, managed by Thameslink, step-free category C, platform level with the entrance
- Elephant & Castle Train Station (station information and live boards) Southeastern, 20 October 2026platforms 1 to 4 listed on the live boards; platform facilities; no step-free access
- StopPoint HUBEPH: Elephant & Castle (lines by mode: Bakerloo, Northern, Southeastern, Thameslink) Transport for London (Unified API), 20 October 2026the Underground and National Rail stops as one hub; Bakerloo and Northern lines; fare zones 1 and 2
- Elephant & Castle (page 1) Kent Rail1862 opening and trainshed, 1866 quadrupling, platform layout
- Elephant & Castle (page 2) Kent Rail1925 electrification, May 1941 bomb damage, 1948 repairs, 1965 shopping centre, 1988 Thameslink
- Is an upgrade for Elephant & Castle rail station on the cards? SE1 News, 18 February 2023no step-free access; Thameslink manages the station; steep staircases
- Elephant & Castle railway station (lead only) Wikipedia, 20 October 2026four platforms, two on an island; February 1863 permanent station; 1 June 1864 Blackfriars Bridge; service pattern; 2021 fire
- Elephant & Castle tube station (lead only) Wikipedia, 20 October 2026opening dates of the Northern line (18 December 1890) and Bakerloo (5 August 1906) stations
- Platforms, tracks and station outlines of Elephant & Castle, Lewisham and Willesden Junction (Overpass API extracts) OpenStreetMap contributors, 20 October 2026the plan
Where the sources disagree:
- Platform count (4) and numbering (1 to 4) come from Wikipedia and Southeastern’s live boards (platforms 1 to 4 listed), not from a Network Rail or National Rail page, which gives no platform count. The order of the platforms across the viaduct was not confirmed: Kent Rail puts platform 1 on the west side with 2 and 3 the island, yet says the 1866 faces were added on the west.
- The permanent station of February 1863 and the extension to Blackfriars Bridge on 1 June 1864 are from Wikipedia only.
- The Northern line (18 December 1890) and Bakerloo (5 August 1906) opening dates are from Wikipedia only (a search-result summary agrees).
- The 2021 fire date and cause are from Wikipedia; press reports agree on 28 June 2021 and 15 engines but gave the cause as unknown at the time. Wikipedia’s cause (a car in a spray booth) is not used.
- Service pattern: Wikipedia gives off-peak Thameslink with Class 700 only (2 trains an hour to Blackfriars, 4 to St Albans City, 4 to Sutton, 2 to Sevenoaks via Catford) and a few Southeastern peak trains. A search summary of other sites gives a different split (about twelve an hour including West Hampstead Thameslink and Luton) and attributes the Sevenoaks trains to Southeastern. Southeastern’s live boards show Blackfriars, St Albans, Sutton, Sevenoaks via Catford and Bedford. No operator timetable was opened. Class 700 is the only stock listed; the Southeastern peak units were not identified.
- Whether the canopies seen today date from 1948, and whether any of the 1862 structure survives, is not confirmed (Kent Rail photograph captions only).
- Wikipedia gives a shopping-centre entrance closure of September 2020 and plans for a new rail entrance and arches opened to Elephant Park; both are left out as Wikipedia only and undated. The new Northern line ticket hall (Wikipedia: 2028/9) is not used.
- Listing status: not found; Historic England’s site was not opened.
- National Rail names Thameslink as manager but does not state the owner; Wikipedia says Network Rail owns the station. ORR’s facility owner was not read. Wikipedia’s DfT category E is not used.
- Stairs-only access is from National Rail (category C), Southeastern and SE1 News (February 2023); no step-free scheme is confirmed.
- 18 December 1890: The City and South London Railway opens its station below, now the Northern line’s: the date is from Wikipedia only.
- 5 August 1906: The Baker Street and Waterloo Railway, now the Bakerloo line, opens its Elephant & Castle station as its southern terminus: the date is from Wikipedia only.
- 28 June 2021: A fire in the railway arches below fills the station with smoke and the station and line close for a time; the station itself is not damaged: the date is from Wikipedia only.