Stations › London termini › Fenchurch Street
Fenchurch Street
The London and Blackwall Railway’s terminus, opened in 1841, and since 1858 the London end of the line to Tilbury and Southend. Its 1854 front survives; the platforms behind now run under an office block.
Facts
- Opened
- 20 July 1841, by the London and Blackwall Railway, replacing its Minories terminus
- Platforms
- 4, all terminal, on two islands raised on a viaduct (Wikipedia only)
- Routes
- The London, Tilbury and Southend line
- Operators
- c2c
- Underground
- None inside the station: Tower Hill (Circle and District) is about two minutes’ walk, and Tower Gateway DLR about eight minutes’ walk
- Roof
- The 1854 trussed-arch roof was removed in the 1980s (Wikipedia), and the platforms now lie under an office block
- Architect
- George Berkeley (the 1854 front; Historic England queries the attribution); William Tite designed the 1841 station
- Listed
- The front block only, Grade II (Historic England, entry 1079149)
- Interchanges
- 0.84 million (2024-25)
- Managed by
- c2c
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
Where trains go
Fenchurch Street’s routes follow the railway out of London, then split to the parts of the country they reach, set at their compass bearings; point at a line to see who runs it. The other termini are the small dots; select one to open its page. Distances are true at the circle’s edge, 6 miles (10 km) out, and stretched towards the middle so the termini have room. The route colour is the map’s own: not official, and not any operator’s livery. All 13 together: the map on the Maps page.
Platforms 4
Seen from above, to scale: the platforms, tracks and the station building’s outline (the grey line) from OpenStreetMap, the buffer stops on the left (north is marked top left). OpenStreetMap maps each island as one platform, so they’re numbered in pairs.
Trains
c2c’s whole fleet.
History 5
- Opens for the London and Blackwall Railway, designed by William Tite.
- Rebuilt, with the front block by George Berkeley (Historic England gives 1853).
- Becomes the London terminus of the London, Tilbury and Southend Railway.
- The front block is listed, Grade II.
- The roof is removed and an office block built over the platforms (Wikipedia).
Sources 9
Show the 9 sources from Grace's Guide to British Industrial History, Wikipedia, Transport for London and 6 more
- Fenchurch Street Railway Station Grace's Guide to British Industrial Historyopening date and company, today's building, routes, the train shed, architect, opened, the rebuild, the architects
- Fenchurch Street railway station Wikipediaplatforms, the roof’s removal
- Unified API, StopPoint 910GFENCHRS Transport for Londonoperators
- London Fenchurch Street c2cconnections
- London Fenchurch Street: station information National Railwho manages it, managed by
- Table 1410: passenger entries and exits and interchanges by station, April 2024 to March 2025 (with each station's facility owner) Office of Rail and Road, 4 December 2025entries and exits, interchanges and rank, entries, exits, interchanges, rank
- National Heritage List for England, entry 1079149 Historic Englandlisting, the street front, the front block
- Iron Roofs: Examples of Design, Description (2nd edition) A. T. Walmisley (E. & F. N. Spon), 1888the 1854 roof
- Platforms, tracks and station outlines of the London termini (Overpass API extracts) OpenStreetMap contributors, 10 October 2026the plan
Where the sources disagree:
- Architect's name: 'George Berkley' (brief), 'George Berkeley' (Grace's Guide) and 'G Berkeley (?)' (Historic England, which also queries the attribution). Date: 1853 (Historic England) vs 1854 (Grace's Guide, Wikipedia).
- Facing direction (north-west onto Fenchurch Place) is inferred from TfL's entrance coordinates and the station address, not stated in a source.
- Platform count (4) and the 1854 roof dimensions (105 ft by 299 ft) are from Wikipedia only.
- Roof removal and office overbuild date: Wikipedia says 1980s; one search snippet said the office development (RHWL) was completed in 1988, unverified.