Freight locomotives
The 20 classes found at work on British freight in October 2026, with the figures a drawing will be made from. Where a class is drawn its row links to the drawing; the dimensions are what could be found, and the gaps are marked.
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
| Class | Type and builder | Built | Power | Top speed | Weight | Size | Bogie | In freight service (as at October 2026) | Drawing |
|---|---|---|---|---|---|---|---|---|---|
Class 08 (and 08/9) shunterstatus and doubtsEnglish Electric 6KT diesel, 2 x EE 506 DC traction motors In use as depot and yard shunters. Class 08 count by operator in 2026 is only partly known; weight 49-51 long tons (49.8-51.8 t).
| diesel-electric shunter locomotive British Railways works at Crewe, Darlington, Derby, Doncaster and Horwich | 1952-1962 | 298 kW (400 hp) | 15 mph (24 km/h) | 50 t | long 29 ft 3 in8.92 m high 12 ft 9 in3.877 m wide 8 ft 6 in2.591 m | wheels 4 ft 6 in1.372 m | GB Railfreight 5 Freightliner 7 | Drawing to come 4 of 6 dimensions found |
Class 09 shunterstatus and doubtsEnglish Electric 6KT diesel GBRf lists 09002 for sale. Few remain in freight use.
| diesel-electric shunter locomotive British Railways at Darlington and Horwich | 1959-1962 (09/0); 1992-93 rebuilds as 09/1, 09/2 | 261 kW (350 hp) | 27 mph (43 km/h) | 49 t | long 29 ft 3 in8.92 m high 12 ft 9 in3.874 m wide 8 ft 6 in2.591 m | wheels 4 ft 6 in1.372 m | GB Railfreight 2 | Drawing to come 4 of 6 dimensions found |
Class 18 battery-hybrid shunter (Clayton CBD90 Hybrid+)status and doubtsJCB DIESELMAX 430 diesel generator plus 524 kWh lead-acid batteries; DC motors GBRf leased four from Beacon (Aug 2024); Tata Steel and Sellafield also use the type.
| diesel-battery shunter locomotive Clayton Equipment Company, Burton upon Trent | 2021 onwards (first delivered Feb 2022) | 416 kW (558 hp) | 12 mph (19 km/h) | 90 t | – | – | GB Railfreight 4 | Drawing to come 0 of 6 dimensions found |
Class 20status and doubtsEnglish Electric 8SVT Mk.II diesel; EE 526 DC motors Few in freight/industrial use: HNRC/Swietelsky (Hope Cement Works), Balfour Beatty (Drain Train). Infobox '6 in service' is undated.
| diesel-electric locomotive English Electric, Vulcan Foundry and Robert Stephenson and Hawthorns | 1957-1962; 1965-1968 | 746 kW (1,000 hp) | 75 mph (121 km/h) | 73 t | long 46 ft 9 in14.256 m high 12 ft 8 in3.851 m wide 8 ft 9 in2.67 m | wheels 3 ft 7 in1.092 m | Harry Needle Railroad Company Balfour Beatty Rail 2 Locomotive Services Limited 4 | Drawing to come 4 of 6 dimensions found |
Class 37status and doubtsEnglish Electric 12CSVT; DC motors (37/4+ Brush alternator) Still working: Colas infrastructure/freight, Europhoenix (hired to ROG), Loram (37418), HNRC; DRS retired its fleet in 2024; Network Rail uses rebuilt 97/3. 80 mph (129 km/h) with CP7 bogies; weight 102-107 t (37/7 ballasted to 122 t).
| diesel-electric locomotive English Electric, Vulcan Foundry and Robert Stephenson and Hawthorns | 1960-1965 | 1,305 kW (1,750 hp) | 90 mph (145 km/h) | 105 t | long 61 ft 6 in18.75 m high 12 ft 9 in3.89 m wide 8 ft 11 in2.71 m | wheels 3 ft 9 in1.143 m | Colas Rail 8 Europhoenix Rail 11 Harry Needle Railroad Company 5 Locomotive Services Limited 5 West Coast Railways 9 Loram UK 1 | Drawing to come 4 of 6 dimensions found |
Class 56status and doubtsRuston-Paxman 16RK3CT diesel; Brush TM73-62 motors Run down at Colas during 2025 (two stood down Feb 2025); DCRail has 56103 in traffic, 56091 stored and 56301 bought from preservation in Mar 2025. 16 rebuilt as Class 69. 2026 working count unknown.
| diesel-electric locomotive Electroputere (56001-030), BREL Doncaster (56031-114), BREL Crewe (56115-135) | 1976-1984 | 2,424 kW (3,250 hp) | 80 mph (129 km/h) | 125 t | long 63 ft 6 in19.35 m high 12 ft 9 in3.89 m wide 9 ft 2 in2.79 m | – | Colas Rail 10 DCRail 2 | Drawing to come 3 of 6 dimensions found |
Class 59 (59/0, 59/1, 59/2)status and doubtsEMD 16-645E3C two-stroke V16; 6 x EMD D77B motors Heavy Haul Rail 14 (13 active, 59104 stored), GBRf 59003 (for sale). Mendip Rail page lists eight, which conflicts. 59/2 max 75 mph (121 km/h). GBRf's page gives 121 t.
| diesel-electric locomotive GM Electro-Motive Division, La Grange (USA) and London, Ontario | 1985-1995 | 2,500 kW (3,300 hp) | 60 mph (97 km/h) | 126 t | long 70 ft 1 in21.349 m high 12 ft 10 in3.912 m wide 8 ft 8 in2.629 m | centres 43 ft 6 in13.259 m wheelbase 13 ft 7 in4.149 m wheels 3 ft 6 in1.067 m | Heavy Haul Rail 14 GB Railfreight 1 | Drawing to come 6 of 6 dimensions found |
Class 60status and doubtsMirrlees Blackstone 8MB275T; 6 x Brush TM2161A Slowly returning: GBRf 7 in traffic of 10, Europhoenix/DBIH 66 owned with a handful active (60062, 60063, 60074), DCRail part-active (17 listed). DB Cargo has sold its fleet. Weight 129 or 131 t; 'wheelbase' on Wikipedia is 50 ft 2 in (15.3 m; not bogie centres).
| diesel-electric locomotive Brush Traction, Loughborough | 1989-1993 | 2,310 kW (3,100 hp) | 60 mph (97 km/h) | 129 t | long 70 ft 0 in21.34 m high 13 ft 0 in3.95 m wide 8 ft 8 in2.64 m | – | GB Railfreight 10 DCRail Europhoenix Rail 66 | Drawing to come 3 of 6 dimensions found |
Class 66 (66/0, 66/3, 66/4, 66/5, 66/6, 66/7, 66/8, 66/9)status and doubtsEMD 12N-710G3B-T2 two-stroke V12 (139.6 L); 6 x EMD D43TRC motors; 1,850 kW at the rail Backbone of GB freight. 129.6 t is the UIC II/Stage IIIA weight; original spec 127 t (GBRf's page 127 t). Sub-classes: 66/0 DB Cargo 223 built; 66/3 16; 66/4 24 (intermodal, 75 mph (121 km/h)); 66/5 81; 66/6 28 (65 mph (105 km/h), regeared); 66/7 99 (GBRf); 66/8 5 (Colas 66846-850); 66/9 7 (66951-957, low-emission, reduced fuel).
| diesel-electric locomotive GM Electro-Motive Diesel (EMD), London, Ontario and Muncie, Indiana | 1998-2008 (and 2014-15 low-emission batches) | 2,462 kW (3,300 hp) | 75 mph (121 km/h) | 129.6 t | long 70 ft 3 in21.40 m high 12 ft 10 in3.91 m wide 8 ft 8 in2.63 m | – | DB Cargo UK 137 GB Railfreight 104 Freightliner 46 Heavy Haul Rail 58 Direct Rail Services 19 Colas Rail 5 | Drawn (indicative) 3 of 6 dimensions found |
Class 67status and doubtsEMD 12N-710G3B-EC; 4 x EMD D43FM motors Wikipedia infobox 21 in service, 8 stored, 1 scrapped (June 2026). Some leased to Transport for Wales; Royal Train 67005 and 67006. Weight 88-90 t.
| diesel-electric locomotive Alstom Meinfesa, Valencia (EMD drive components) | 1999-2000 | 2,386 kW (3,200 hp) | 125 mph (201 km/h) | 89 t | long 64 ft 8 in19.71 m high 12 ft 11 in3.93 m wide 8 ft 11 in2.71 m | centres 38 ft 2 in11.63 m wheelbase 9 ft 2 in2.80 m wheels 3 ft 2 in0.965 m | DB Cargo UK 26 Colas Rail 2 | Drawn: see its page 6 of 6 dimensions found |
Class 68 (Stadler UKLight)status and doubtsCaterpillar C175-16 diesel; ABB AC/AC; 4 nose-suspended motors 34 built. DRS about 20 for freight and nuclear, 14 with Chiltern Railways (passenger). Fuel tank up to 5,600 L (Stadler) vs 5,000 L.
| diesel-electric locomotive Vossloh Espana (2013-15), then Stadler Rail Valencia (2016-17) | 2013-2017 | 2,800 kW (3,750 hp) | 100 mph (161 km/h) | 85 t | – | wheels 3 ft 7 in1.10 m | Direct Rail Services 20 | Drawn: see its page 1 of 6 dimensions found |
Class 69 (rebuilt from Class 56)status and doubtsEMD 12N-710G3B-T2 two-stroke V12 (139.6 L); original motors overhauled 69001-69016, all GBRf. Several in heritage and special liveries (see livery list). 128 t from GBRf's page.
| diesel-electric locomotive Progress Rail, Longport (rebuild of Class 56 bodies and bogies) | 2020-2025 rebuild | 2,390 kW (3,200 hp) | 80 mph (129 km/h) | 128 t | long 63 ft 6 in19.355 m high 13 ft 0 in3.96 m wide 9 ft 2 in2.792 m | centres 47 ft 6 in14.48 m wheelbase 13 ft 5 in4.10 m wheels 3 ft 9 in1.143 m | GB Railfreight 16 | Drawing to come 6 of 6 dimensions found |
Class 70 (GE PowerHaul PH37ACmi)status and doubtsGE PowerHaul P616 diesel; 6 AC traction motors (Wikipedia: GE 5GEB30 axle-hung) 19 with Heavy Haul Rail (16 active, 3 stored; 70012 a test bed), 17 with Colas (70801-817). 2,250 kW at the wheel rim. Max speed 120 km/h (75 mph; Akiem) = 75 mph (121 km/h).
| diesel-electric locomotive General Electric, Erie, Pennsylvania | 2009-2011 (Akiem: 2009-2012) | 2,750 kW (3,690 hp) | 75 mph (121 km/h) | 129 t | long 71 ft 3 in21.71 m high 12 ft 10 in3.917 m wide 8 ft 8 in2.642 m | wheels 3 ft 6 in1.067 m | Heavy Haul Rail 19 Colas Rail 17 | Drawing to come 4 of 6 dimensions found |
Class 73 (73/1 and 73/9)status and doubts750 V DC third rail (1,600 hp one-hour); 73/1: EE 4SRKT diesel 600 hp; 73/9: Cummins QSK19 or MTU 8V 4000 R43L GBRf: 9 x 73/1 and 11 x 73/9 (5 'Tier 1' for Network Rail, 6 'Tier 2' for Caledonian Sleeper, passenger). Network Rail sold its two 73/9 in 2023. Weight 76.8 long tons (78.0 t) Wikipedia; 77 t GBRf page.
| electro-diesel (third rail and diesel) locomotive English Electric, Vulcan Foundry (73/9: rebuilt by Brush Traction/Wabtec from 2013) | 1965-1967; 73/9 rebuilds 2013 onward | 1,193 kW (1,600 hp) | 90 mph (145 km/h) | 77 t | long 53 ft 8 in16.36 m | wheels 3 ft 4 in1.016 m | GB Railfreight 20 Harry Needle Railroad Company 2 | Drawing to come part of this class is drawn: see its page 2 of 6 dimensions found |
Class 88 (Stadler UKDUAL)status and doubts25 kV AC pantograph; Caterpillar C27 Stage IIB diesel (708 kW); ABB AC/AC 88001-88010, all with DRS, owned by Beacon. Diesel power 708 kW (Stadler; Wikipedia 700 kW). 21.5 t axle load.
| electro-diesel locomotive Vossloh Espana / Stadler Rail Valencia | 2015-2016 | 4,000 kW (5,400 hp) | 100 mph (161 km/h) | 86 t | – | wheels 3 ft 6 in1.067 m | Direct Rail Services 10 | Drawing to come 1 of 6 dimensions found |
Class 90status and doubts25 kV AC; 4 x GEC 412 motors Freightliner (CMA CGM) 27 plus 90050 on loan to Crewe Heritage Centre; LSL 3 for charters; DB Cargo's fleet is stored or scrapped. in_service_total is the Freightliner freight fleet (27); 50 were built.
| electric locomotive BREL Crewe Works | 1987-1990 | 3,730 kW (5,000 hp) | 110 mph (177 km/h) | 84.5 t | long 61 ft 6 in18.75 m high 13 ft 0 in3.969 m wide 8 ft 10 in2.70 m | centres 32 ft 9 in9.98 m wheelbase 10 ft 9 in3.28 m wheels 3 ft 10 in1.156 m | Freightliner 27 Locomotive Services Limited 3 DB Cargo UK 0 | Drawing to come 6 of 6 dimensions found |
Class 92status and doubts6 x Brush asynchronous AC motors; 25 kV overhead or 750 V third rail GBRf 12 (Caledonian Sleeper and Channel Tunnel freight); DB Cargo 4 active of a stored fleet; 13 exported to Bulgaria and Romania, more to Croatia. GBRf's page says 90 mph (145 km/h) and 126 t. RAIL (Oct 2026): increasingly unreliable.
| electric (25 kV AC and 750 V DC) locomotive ABB Transportation and Brush Traction | 1993-1996 | 5,040 kW (6,760 hp) | 87 mph (140 km/h) | 126 t | long 70 ft 1 in21.36 m high 13 ft 0 in3.96 m wide 8 ft 8 in2.64 m | centres 41 ft 11 in12.764 m wheelbase 14 ft 1 in4.29 m wheels 3 ft 9 in1.14 m | GB Railfreight 12 DB Cargo UK 4 | Drawn: see its page 6 of 6 dimensions found |
Class 93 (Stadler tri-mode)status and doubts25 kV AC (4,000 kW, boost 4,600), CAT C32 Stage V diesel (900 kW), two LTO batteries (400 kW) Ten delivered to ROG; entered service Oct 2025; trial runs for DB Cargo (10 Feb 2026) and Freightliner; stored at DRS Gresty Bridge; no regular freight contract yet. Width 8 ft 10 in (2,690 mm) is the carbody width.
| electro-diesel-battery locomotive Stadler Rail Valencia | 2022-2024 (10 built) | 4,000 kW (5,360 hp) | 110 mph (177 km/h) | 86 t | long 67 ft 3 in20.50 m wide 8 ft 10 in2.69 m | – | Rail Operations Group 10 | Drawing to come 2 of 6 dimensions found |
Class 97/3 (Network Rail ERTMS rebuilds of Class 37)status and doubts97301 (stored), 97302, 97303 'Dave Berry', 97304 'John Tiley'; autumn rail-head treatment and ERTMS tests on the Cambrian lines.
| diesel-electric locomotive English Electric (original Class 37); rebuilt by Network Rail at Barrow Hill | built 1960-65; rebuilt 2008 | as Class 37 plus ERTMS equipment | – | – | – | – | Network Rail 4 | Drawing to come 0 of 6 dimensions found |
Class 99 (Stadler)status and doubts25 kV AC (6,170 kW at wheel rim) plus Cummins QSK50 Stage V diesel (1,790 kW); AC/AC; HVO fuel; tractive effort 500 kN 99001 first commercial train 28 July 2026; at least 99001-99013 delivered by Sept 2026 (99013 appears in a RAIL report). 99001-020 no train supply, 99021-030 with ETS (for Belmond). 13 more may be ordered for Caledonian Sleeper (not confirmed).
| electro-diesel (bi-mode) locomotive Stadler Rail Valencia (for Beacon Rail) | 2025 onward (30 ordered; first two arrived 10 June 2025) | 6,170 kW (8,270 hp) | 75 mph (121 km/h) | 113 t | – | – | GB Railfreight 13 | Drawing to come 0 of 6 dimensions found |
Left out: Classes 47, 57 and 86, because no freight work was found for them in 2026. The Class 93 is stored, with no freight contract yet. Counts come from sources of different dates and are indicative.
Sources
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 48 sources from Wikipedia, RAIL magazine, Wikimedia Commons and 7 more
- British Rail Class 08 Wikipedia (secondary; must be paired), 2026-10-25infobox dimensions, engine, 15 or 20 mph (32 km/h)
- GB Railfreight - Locomotives page GB Railfreight, undated (read 2026-10-25)50 t, 15 mph (24 km/h), 08925 and 08934 for sale
- How Freightliner locomotive fleets are splitting after intermodal sale RAIL magazine, 2026-02-117 with Freightliner intermodal
- British Rail Class 09 Wikipedia (secondary; must be paired), 2026-10-25infobox
- British Rail Class 18 Wikipedia (secondary; must be paired), 2026-10-25specs
- GB Railfreight Wikipedia (secondary; must be paired), 2026-10-25 (page edited 2026-07-30)four with GBRf from Aug 2024
- British Rail Class 20 Wikipedia (secondary; must be paired), 2026-10-25infobox
- Locomotive Services Limited Wikipedia (secondary; must be paired), 2026-10-25LSL owns four (heritage)
- British Rail Class 37 Wikipedia (secondary; must be paired), 2026-10-25infobox, 2024 fleet summary
- Europhoenix Rail Ltd to continue after buy-out by aggregates firm RAIL magazine, 2026-07-3111 Europhoenix
- Direct Rail Services announces retirement of Class 37 locomotives Direct Rail Services, 2024-01-22DRS retirement
- Colas Rail Wikipedia (secondary; must be paired), 2026-10-25Colas 8
- British Rail Class 56 Wikipedia (secondary; must be paired), 2026-10-25infobox
- Colas confirms intention to reduce use of Class 56s during 2025 RAIL magazine, 2025-02-25Colas 10, run-down, DCRail
- British Rail Class 69 Wikipedia (secondary; must be paired), 2026-10-25Class 56 body dimensions in the 69 rebuild
- British Rail Class 59 Wikipedia (secondary; must be paired), 2026-10-25full dimension set
- British Rail Class 60 Wikipedia (secondary; must be paired), 2026-10-25infobox
- Class 60s return to action with three operators RAIL magazine, 2026-10-22operator status Oct 2026
- Aggregates firm set to buy Europhoenix train licence RAIL magazine, 2026-07-07DBIH buys
- Class 66 data sheet (Fiche Class 66 EN) Akiem (locomotive lessor), 20182,462 kW, 1,850 kW at rail, 75 mph (121 km/h), 129.6 t, length 70 ft 3 in (21.400 m)
- DB Cargo UK Fleet (undated page) DB Cargo UK, undated (read 2026-10-25)3,300 bhp, 75 mph (121 km/h), 70 ft 3 in (21.4 m), 129.6 t
- British Rail Class 66 Wikipedia (secondary; must be paired), 2026-10-2570 ft 2 in (21.39 m), 8 ft 8 in (2.63 m) wide, 12 ft 10 in (3.91 m) high; sub-classes
- Twenty DB Cargo UK Class 66s set for export to Romania RAIL magazine, 2026-01-19DB Cargo 137 active
- Class 66 data (loco-info.com) loco-info.com, undatedwheelbase 57 ft 1 in (17.41 m), rigid 13 ft 9 in (4.19 m)
- 66702 _Blue Lightning_ Ely DGL 170522.jpg (photograph, CC BY 2.0) Wikimedia Commons (kitmasterbloke), 21 May 2022the drawing's outline, layout and heights (rectified, level); the GBRf livery
- 66073 Toton 071022.jpg (photograph, CC BY 2.0) Wikimedia Commons (kitmasterbloke), 14 October 2022the DB Cargo livery, the cab doors and details (ratios only)
- 66701 Toton 071022.jpg (photograph, CC BY 2.0) Wikimedia Commons (kitmasterbloke), 14 October 2022a cross-check of the layout; GBRf's colours in overcast light
- Freightliner 66591 (no 1 end, left side).JPG (photograph, CC BY-SA 4.0) Wikimedia Commons (Geof Sheppard), 14 November 2021the HTCR bogie's layout and the wheel size (by ratio)
- 66 598 Rivenhall side on 231120.jpg (photograph, CC BY 2.0) Wikimedia Commons (kitmasterbloke), 23 November 2020the bogie and underframe cross-check; the Freightliner livery
- 66847 and 66849 Eastleigh 301223.jpg (photograph, CC BY 2.0) Wikimedia Commons (kitmasterbloke), 31 December 2023the Colas Rail livery (rectified on its grilles)
- 66421 Gresty Bridge TMD Wilsons Lane 231121.jpg (photograph, CC BY 2.0) Wikimedia Commons (kitmasterbloke), 23 November 2021the DRS livery's blue (read off its cab doors)
- British Rail Class 67 Wikipedia (secondary; must be paired), 2026-10-25full dimension set
- UKLIGHT diesel-electric locomotive (Class 68) data sheet LDEUKLIGHTBRLLDRS0816e Stadler Rail, 2016-082,800 kW, C175-16, 317 kN, 160 km/h (99 mph), Bo'Bo'
- British Rail Class 68 Wikipedia (secondary; must be paired), 2026-10-2585 t, wheel diameter 3 ft 7 in (1,100 mm)
- Class 70 data sheet (Fiche Class 70 EN) Akiem (locomotive lessor), 20182,750 kW, 2,250 kW at the wheel rim, 120 km/h (75 mph), 129 t, 71 ft 3 in (21.710 m)
- British Rail Class 70 Wikipedia (secondary; must be paired), 2026-10-2571 ft 3 in (21.710 m), 12 ft 10 in (3.917 m), 8 ft 8 in (2.642 m), wheel diameter 3 ft 6 in (1,067 mm)
- British Rail Class 73 Wikipedia (secondary; must be paired), 2026-10-25infobox
- UKDUAL locomotive (Class 88) data sheet LUKDUALBRLLDRS0816e Stadler Rail, 2016-084,000 kW, 708 kW diesel, 317 kN, 160 km/h (99 mph)
- British Rail Class 88 Wikipedia (secondary; must be paired), 2026-10-2586 t, wheel diameter 3 ft 6 in (1,067 mm)
- British Rail Class 90 Wikipedia (secondary; must be paired), 2026-10-25full dimension set
- British Rail Class 92 Wikipedia (secondary; must be paired), 2026-10-25full dimension set
- Class 93 tri-mode locomotive data sheet LC93_ROL0524en Stadler Rail, 2024-05length over buffers 67 ft 3 in (20,500 mm), carbody width 8 ft 10 in (2,690 mm), power, 110 mph (177 km/h), fuel 3,200 L
- British Rail Class 93 Wikipedia (secondary; must be paired), 2026-10-2586 t
- British Rail Class 97 Wikipedia (secondary; must be paired), 2026-10-25list of 97/3
- Class 99 bi-mode locomotive, vehicle data sheet LC99_Beacon0924 Stadler Rail, 2024-09power, engine, 500/430 kN, 120 km/h (75 mph), fuel
- British Rail Class 99 Wikipedia (secondary; must be paired), 2026-10-25113 t
- The UK's first hybrid freight locomotive enters commercial service Rail Forum UK (GBRf release), 2026-08-03first commercial service
- More Class 99s expected to be ordered for Caledonian Sleeper work RAIL magazine, 2026-10-16variants and numbers
- 2,400 bhp (1,790 kW) at rail.
- 2,500 hp (1,864 kW) at rail is flagged 'citation needed'.
- 73/9 diesel power (1,500 hp) differs from the 73/1 class figure (600 hp / 447 kW).
- All dimensions are Wikipedia only (length 61 ft 6 in (18.75 m) not stated as over buffers).
- Bogie centres and bogie wheelbase are to be confirmed.
- Bogie centres field is the Wikipedia 'pivot centres' value 43 ft 6 in (13,259 mm).
- Bogie centres, bogie wheelbase and wheel diameter are to be confirmed.
- Bogie data not given (overall wheelbase 50 ft 8 in (15,440 mm)).
- Bogie data not on the Class 56 page; see Class 69 (bogie wheelbase 4,100, pivot centres 14,480).
- Bogie wheelbase: 13 ft 7 in (4,150 mm; 2007 Wikipedia mirror) vs 13 ft 9 in (4,190 mm; loco-info 'rigid wheelbase'): conflict, left null. Bogie centres and wheel diameter are to be confirmed (overall wheelbase 56 ft 9 in or 57 ft 1 in (17.29 or 17.41 m)).
- Class 08/9 height is 11 ft 10 in (3,597 mm; Wikipedia).
- Counts of 66 per operator are partly from Wikipedia (GBRf, DRS, Colas) and not cross-checked.
Know a source for one of these? Send it to us → (opens in a new tab)