Rolling stock › On order and plannedData updated
New Bakerloo line trains
Trains of the same design as the 2024 Stock, to replace the 1972 Stock. New trains and signalling would allow up to 24 trains an hour through central London.
New Bakerloo line trains · indicative drawing GB Trains · gbtrains.uk/stock/bakerloo-new/ · CC BY 4.0
You’re welcome to use this drawing
Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:
Drawing: GB Trains, gbtrains.uk, CC BY 4.0Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers
Compare with the 2024 Stock and the New Central and Waterloo & City trains →
- Type
- Electric multiple unit
- Builder
- Siemens Mobility (option on the 2024 Stock contract)
- In service
- early 2030s (TfL); some reports say about 2035
- Lines
- Bakerloo
- Trains in fleet
- about 36 expected
- Profile
- tube
- Status
- Not yet ordered. TfL must exercise the Siemens option by 1 November 2026. Depot works at Stonebridge Park, Queen's Park and London Road are planned for July 2027 to December 2034.
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
Sources
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
- Mayor's Question Time: Bakerloo line London Assembly, March 2024option deadline
- Bakerloo line train upgrade moves forward as TfL seeks land for larger depots IanVisits, 1 July 2026fleet size, frequency, timescale
- TfL reopens market engagement for major Bakerloo line upgrade and new rolling stock programme Rail Technology Magazinedepot works programme
- Hopes TfL funding deal will lead to new Bakerloo line trains RAILfunding
- AECOM to deliver depot and sidings feasibility study for TfL's Bakerloo line upgrade AECOM, August 2026depot feasibility study
- Number of trains (reports range from 34 to 40)
- Service date
Know a source for one of these? Send it to us → (opens in a new tab)