Rolling stock › WithdrawnData updated
District Railway electric locomotives
Ten locomotives, Nos 1A to 10A, the Underground group's first steel-bodied vehicles: bodies by Metropolitan Amalgamated, ordered in September 1904 and delivered from June 1905, and four 200 hp British Thomson-Houston motors each (800 hp). Single-ended and worked in pairs back to back, from 4 December 1905 they took the London & North Western's trains from Broad Street between Earl's Court and Mansion House, until the end of 1908, and in 1909-10 worked Circle trains, one locomotive to four trailers. From 1 June 1910 they hauled the London, Tilbury & Southend through trains from Ealing Broadway as far as Barking. Three were stripped for their equipment in 1910; the rest, renumbered L1 to L7 in 1932, were withdrawn on 1 October 1939 and scrapped within six weeks, two having gone in 1938.
District Railway electric locomotives · indicative drawing GB Trains · gbtrains.uk/stock/district-elocos/ · CC BY 4.0
You’re welcome to use this drawing
Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:
Drawing: GB Trains, gbtrains.uk, CC BY 4.0Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers
- Type
- Electric locomotive (Bo-Bo, 800 hp), worked in pairs
- Builder
- Metropolitan Amalgamated (bodies); BTH (electrical)
- Built
- 1905
- In service
- 1905–1939
- Lines
- District
- Formation
- Two locomotives coupled back to back, as drawn: the District worked them in pairs, 'a locomotive in two units'
- Bogies
- the District's A Type cast-steel motor bogies (Hedley design), with their shoebeams
- Car height
- 12 ft 3¼ in (3.74 m)
- Car width
- 8 ft 8 in (2.642 m)
- Profile
- sub-surface
- Walk-through
- No
- Air-conditioned
- No
Car types
| Code | Car | Length | Doors per side |
|---|---|---|---|
| L | District locomotive (one unit of a pair) | 25 ft 10½ in7.887 m |
Sources
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 8 sources from London Underground Railway Society, McGraw Publishing, Wikipedia and 1 more
- District Electric Trains, 8: Electric Locomotives (Underground News) London Underground Railway Society (Piers Connor), October 2009ten locomotives 1A-10A; bodies ordered from Metropolitan Amalgamated in September 1904, BTH equipment; first steel bodies; single-ended, worked in pairs; delivery from 12 June 1905; LNWR trains from 4 December 1905 to 31 December 1908; Circle trains 1909-10; Ealing Broadway-Barking on the LT&S through service from 1 June 1910; renumbered L1-L7 1932; withdrawn 1 October 1939; scrap dates
- District Electric Trains, 8: Electric Locomotives (Underground News) London Underground Railway Society (Piers Connor), October 2009, p. 5 (Figure 3)the scale drawing's dimensions (see the drawing's notes)
- Electric Locomotives for London & Northwestern Cars in London (Street Railway Journal, vol. XXVII no. 1, 1906, p. 46) McGraw Publishing (scanned by the Internet Archive, Smithsonian Libraries; photographs on Wikimedia Commons), p. 46bodies and trucks by Metropolitan Amalgamated; BTH GE-69 motors, 4 x 200 hp; two locomotives to each LNWR train, attached at Earl's Court for Mansion House
- Report of Society Meeting: The Metropolitan Electric Locomotives (Underground News; a talk by Charles Horsey, reported by Amanda Griffiths) London Underground Railway Society, 2024 (the talk was given on 3 September 2024)District electric locomotives still on the Southend trains in 1938
- London Underground electric locomotives Wikipediabackground (Wikipedia)
- District Electric Trains, 8: Electric Locomotives (Underground News) London Underground Railway Society (Piers Connor), October 2009, p. 5layout of the underframe equipment (Figure 3's plan: the brake reservoir and cylinders between the bogies)
- Electric Locomotives for London & Northwestern Cars in London (Street Railway Journal, vol. XXVII no. 1, 1906, p. 46) McGraw Publishing (scanned by the Internet Archive, Smithsonian Libraries; photographs on Wikimedia Commons)layout of the underframe equipment (a dark mass under the solebar between the bogies; layout only)
- GM/RT2100 Issue 4: Requirements for Rail Vehicle Structures RSSB (Rail Safety and Standards Board), December 2010the GB buffer height range, 3 ft 1 in to 3 ft 6 in (940-1,065 mm) above rail (8.3.2), against which the buffers are drawn
- The weight (not stated): LURS gives 36 tons and notes sources saying 28; the Street Railway Journal gives about 56 tons for the pair
- The scrap dates: LURS's table has 2A and 7A scrapped on 1 July 1938, its text L2 and L7 scrapped by 1 October 1939
- Drawing: the heights of the side's parts and the colour are estimated (see the drawing's notes)
- The underframe: indicative: positions from Connor's plan (Figure 3), heights and depths estimated; the 1906 photograph shows only a dark mass between the bogies; the brake gear hangs on the right-hand side (the plan), the leading locomotive's far side
Know a source for one of these? Send it to us → (opens in a new tab)