Rolling stock › In service

CR4000 (Bombardier Flexity Swift)

The trams the network opened with: 24 three-section Bombardier trams, with two double doors a side on each end section.

CR4000 (Bombardier Flexity Swift), schematic side elevation, 3 cars
30.1 m long
Schematic side elevation of a full train, drawn from the dimensions below. Drawn at 10 px per metre. Download SVG
Type
Tram, three sections, 76% low floor
Builder
Bombardier, Vienna (Austria)
Built
1998–1999
In service
since 2000
Lines
Trams
Formation
Three sections (14.35 + 1.4 + 14.35 m), 30.1 m, double-ended
Trains in fleet
24 built (2530–2553); 22 in service
Top speed
80 km/h
Power
750 V DC overhead; four 120 kW motors
Train length
30.10 m
Car height
3.60 m
Car width
2.65 m
Profile
tram
Seats per train
70
Total capacity
70 seats and 138 standing at 4 per m²
Status
In service. 2551 was written off after the Sandilands derailment, and 2542 and 2548 were combined into one tram in 2025. TfL plans 24 new trams for the early 2030s.

Car types

CodeCarLengthDoors per side
ENDEnd section, with a cab14.35 m2 double
MIDCentre section, over the trailer bogie1.40 m

Sources

How we source figures →

unverified length: Bombardier gives 30.1 m, RAIB 30.5 m (perhaps over couplers), motor power: the data sheet doesn't say whether 120 kW is per motor, number in service: 22 (from British Trams Online and DfT's fleet of 34), bogie centres: the drawing gives 11.6 m, the data table 10,850 mm