Rolling stock › In serviceData updated

Class 769 FLEX

A Class 319 electric train of the late 1980s, built for Thameslink, given a diesel generator under each driving car so it can run beyond the overhead wires. Porterbrook and Brush converted eight for Northern, which has run them since May 2021 between Southport, Wigan, Bolton, Manchester and Stalybridge.

Drawing to come

Type
Bi-mode multiple unit (electric and diesel)
Builder
BREL, York (as Class 319s); converted by Wabtec Brush at Loughborough for Porterbrook
Built
1988 (as Class 319/4s); converted from 2018
In service
since 2021
Operators
Northern
Formation
4 cars: a motor car, a trailer with a toilet, and two driving trailers, each with a diesel generator underneath (DTSO-MSO-TSOL-DTCO, as built as Class 319/4s)
Trains in fleet
8
Fleets
Northern: 8
Top speed
100 mph on electric power; about 87 mph on diesel (Porterbrook's modelling, 2018)
Power
Bi-mode: 25 kV AC overhead, or two 390 kW MAN D2876 diesel engines driving ABB alternators, one under each driving trailer, feeding the Class 319's four GEC traction motors (990 kW) on the motor car
Car height
3.58 m
Car width
2.82 m
Profile
main-line
Total capacity
286 or 303 seats and 105 or 109 standing per unit (Northern's 2022 contract)
Status
In service with Northern: eight units (769424, 431, 434, 442, 448, 450, 456 and 458), maintained at Allerton, with former Transport for Wales units hired in to cover overhauls at Brodie Engineering, Kilmarnock. Northern plans to replace them in 2032.

Car types

CodeCarLengthDoors per side
DTSODriving trailer standard open, with a diesel generator (DTSO)19.83 m2 double
MSOMotor standard open (MSO)19.92 m2 double
TSOLTrailer standard open with lavatory (TSOL)19.92 m2 double
DTCODriving trailer composite open, with a diesel generator (DTCO)19.83 m2 double

Sources

How we source figures →

unverified introduced: Northern says the eight made their debut in the May 2021 timetable; Wikipedia gives November 2020, conversion dates: Rail Engineer saw the first units being converted in 2018, and the first was due to Northern in January 2019; when the last was finished isn't recorded, car figures: Porterbrook's 2012 figures for the Class 319/4, before conversion; the diesel equipment is underneath and shouldn't change the body, formation: the 319/4s had first class in the DTCO; whether Northern's units keep it isn't published, though the contract's seat counts (286 or 303) equal those it gives for Class 319s, 750 V DC: the 319s were dual-voltage; Rail Engineer says only GWR's ordered units were to be tri-mode, so Northern's are listed as AC and diesel, replacement: Northern's November 2025 slide puts the 769s in the first replacement programme, with the 150s, 155s and 156s; RAIL (July 2026) gives 2032 for the 769s

Top