Channel Tunnel
Three tunnels under the Strait of Dover between Folkestone and Coquelles, by Calais: two single-track railway tunnels and a smaller service tunnel between them. It is 50.5 km long, 37.9 km of it under the sea, and opened in 1994. Eurostar's trains, the Shuttles that carry cars, coaches and lorries, and freight trains run through it.
Facts
- Opened
- 6 May 1994; passenger services from November 1994
- Ends
- Folkestone (Cheriton) in Kent and Coquelles, by Calais; the portals are at Castle Hill and Beussingue
- Owner and operator
- Getlink, through its Eurotunnel business, under a concession
- Power
- 25 kV 50 Hz overhead; the contact wire 19 ft 5 in to 19 ft 9 in (5,922 to 6,030 mm) above the rail in the tunnel
- Speed limit
- 160 km/h (99 mph)
- Connects to
- High Speed 1 in England (to London St Pancras) and the LGV Nord in France
unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓
Who uses it 3
Eurostar
High-speed passenger trains from St Pancras to Paris, Brussels, Lille, Rotterdam and Amsterdam, over High Speed 1.
Trains: Class 374 (Eurostar e320), Class 373 (Eurostar e300)
LeShuttle
The Shuttles: trains that carry cars, coaches and lorries between the two terminals, hauled by Class 9 locomotives. They never leave the tunnel and its terminals.
Freight
Through freight trains, mostly hauled by Class 92 electric locomotives.
Map
The crossing. The tunnel follows OpenStreetMap’s line of the north running tunnel; the south one is 98 ft (30 m) beside it. The crossover caverns are marked where the published distances put them, and their marks are far larger than the scale allows. Land from Natural Earth.
London to Calais. High Speed 1 is drawn as straight lines between its stations: its real line curves. The Shuttles don’t use it: cars and lorries reach the terminals by road.
Along its length
Cross section
Schematic, to scale from the published inside diameters. The rail level, the heights of the service tunnel and the relief duct, and the lining are indicative. A Shuttle’s outline will be added once its width and height are found in a source.
Statistics 20
Headline
| Figure | Value | Notes |
|---|---|---|
| Length, portal to portal | 50.5 km | Wikipedia gives 50.46 km in one place, 50.5 km in another; Getlink's own page says 50.45 km. Rounding, not a conflict. |
| Under the sea | 37.9 km | The longest undersea tunnel section in the world. 9.3 km under England, 3.3 km under France. |
| Deepest point | Held | Wikipedia gives 246 ft (75 m) below sea level; the Geological Society gives 377 ft (115 m) below the sea surface, with 246 ft (75 m) of rock above the tunnel. Held until a primary source settles it. |
Engineering
| Figure | Value | Notes |
|---|---|---|
| Average depth below the seabed | 148 ft (45 m) | Geological Society: 148 ft (45 m) leaving Kent, 115 ft (35 m) leaving France. |
| Bores | Two running tunnels, 24 ft 11 in (7.6 m); one service tunnel, 15 ft 9 in (4.8 m) | Inside diameters. The running tunnels are 98 ft (30 m) apart. |
| Cross passages | 270 (every 1,230 ft (375 m) by design) | One every 1,230 ft (375 m) by design, joining each running tunnel to the service tunnel: 135 places along 50.5 km, two passages at each. Design diameter 10 ft 10 in (3.3 m). |
| Piston relief ducts | 194 (every 820 ft (250 m) by design) | 6 ft 7 in (2 m) across, joining the two running tunnels over the service tunnel to ease the air pushed ahead of a train. 50.5 km at 820 ft (250 m) would be 202; 194 were built. |
| Crossover caverns | 2: English 8 km from Shakespeare Cliff; French 12 km from Sangatte | Where trains can cross between the running tunnels. Their sizes differ between sources: Wikipedia gives 492 ft × 59 ft × 33 ft (150 x 18 x 10 m); the Geological Society gives 541 ft × 72 ft × 49 ft (165 x 22 x 15 m) for the English one and 591 ft × 82 ft × 62 ft (180 x 25 x 19 m) for the French. |
| Power | 25 kV 50 Hz overhead, wire 19 ft 3 in (5.87 m) above the rail | Eurotunnel's own network statement gives the contact wire 19 ft 5 in to 19 ft 9 in (5,922 to 6,030 mm) above the rail in the tunnel; the cross section draws Wikipedia's 19 ft 3 in (5.87 m). |
Operations
| Figure | Value | Notes |
|---|---|---|
| Tunnel speed limit | 160 km/h (99 mph; designed for 200) | The Class 9 locomotives run at up to 160 km/h (99 mph); Eurostar's trains are held to the tunnel's limit too. |
| Shuttle crossing | 35 minutes platform to platform | About 35 minutes platform to platform; the time in the tunnel itself is shorter. |
| Terminals | Two, each with ten 2,625 ft (800 m) island platforms | Folkestone (about 140 ha) and Coquelles (more than 1,700 acres). Loops: Folkestone clockwise, Coquelles anticlockwise. |
Traffic
| Figure | Value | Notes |
|---|---|---|
| LeShuttle passenger vehicles, 2025 | 2,234,093 | Up 2% on 2024. 2017: 2.6 million cars, 51,000 coaches. |
| LeShuttle Freight trucks, 2025 | 1,163,124 | Down 3% on 2024 (1,198,052). 2017: 1.6 million HGVs. |
| High-speed passengers, 2025 | 11.8 million | Read from a chart label in search results, not yet from the results document. Eurostar carried 10.3 million in 2017; cross-tunnel passenger traffic peaked at 18.4 million in 1998. |
| Rail freight | 1.2 million tonnes in 2017 | An older figure. All freight through the tunnel, Shuttles included, was 19.6 million tonnes in 2007. |
History
| Figure | Value | Notes |
|---|---|---|
| Tunnel boring machines | 11 (6 English, 5 French) | Peak workforce 15,000; ten workers died 1987 to 1993. |
| Cost | £4.65 billion at 1985 prices (£2.6 billion estimated) | An 80% overrun. Wikipedia gives £9.8 billion in 2025 prices. |
| Construction | 1 December 1987 to 6 May 1994 | Service tunnel breakthrough 1 December 1990 (pilot hole 30 October); passenger service from November 1994. |
| Fires | November 1996, 11 September 2008, 17 January 2015 | 1996: damage over 151 ft (46 m), about six months to full operation. 2008: repairs about 60 million euros, full service 9 February 2009. |
1 figure held: the sources disagree, and the page waits for a primary source. Every figure is cited in Sources.
History 7
- Tunnelling starts.
- The service tunnel breaks through under the sea, joining England and France.
- The tunnel opens.
- Eurostar's passenger trains start running through it.
- A fire on a lorry Shuttle damages 151 ft (46 m) of tunnel; about six months to full working.
- High Speed 1 opens in full, and Eurostar moves to St Pancras.
- A second lorry Shuttle fire; full service again on 9 February 2009.
Sources
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 11 sources from Wikipedia, Getlink, The Geological Society and 3 more
- Channel Tunnel Wikipedia, read 27 October 2026lengths, bores, cross passages, ducts, caverns, construction, cost, fires, traffic
- Channel Tunnel (Geosites) The Geological Society, read 27 October 2026the ground, depths below the seabed, the lowest point, cavern sizes
- Eurotunnel Folkestone Terminal; Eurotunnel Calais Terminal; Samphire Hoe; Sangatte Wikipedia, read 27 October 2026the terminals, their platforms and loops; coordinates
- Network Statement: Fixed Link Usage Annual Statement, 2027 Working Timetable (DRR_NS_2027_EN_Final1) Eurotunnel (Getlink), 12 December 2025the power supply and contact-wire height (Eurotunnel's own network statement)
- Revenue 2025 (shuttle traffic in 2025) Getlink, 22 January 2026Shuttle traffic in 2025
- Annual results 2025 Getlink, 26 February 2026high-speed passengers in 2025
- Channel Tunnel, Running Tunnel North (ways 143253041 and 143253058) OpenStreetMap contributors (ODbL), read 27 October 2026the tunnel's line on the maps
- Land polygons Natural Earth (public domain), read 3 October 2026the coastline on the maps
- High Speed 1 Wikipedia, read 25 October 2026High Speed 1 on the London map
- Eurotunnel Class 9 Wikipedia, read 27 October 2026figures in the statistics
- LeShuttle Wikipedia, read 29 October 2026figures in the statistics
- Most figures rest on Wikipedia and the Geological Society, not yet on Getlink's own documents
- The deepest point: Wikipedia gives 246 ft (75 m) below sea level, the Geological Society 377 ft (115 m) below the sea surface with 246 ft (75 m) of cover; held until a primary source settles it
- The cross section's rail level, the service tunnel's and the relief duct's heights, and the lining are drawn indicatively; the diameters are sourced
- The maps: High Speed 1 is drawn as straight lines between its stations; the tunnel follows OpenStreetMap's line of the north running tunnel
- High-speed passengers in 2025 (11.8 million) were read from a chart label in search results