Rolling stock › In serviceData updated

Class 99 (Stadler)

Class 99 (Stadler): a electro-diesel (bi-mode) locomotive (Co-Co (UIC Co'Co')), built by Stadler Rail Valencia (for Beacon Rail), 2025 onward (30 ordered; first two arrived 10 June 2025). A freight locomotive: not drawn yet (set FRT).

Drawing to come

Type
electro-diesel (bi-mode) locomotive
Builder
Stadler Rail Valencia (for Beacon Rail)
Built
2025 onward (30 ordered; first two arrived 10 June 2025)
In service
since 2025
Top speed
75 mph (121 km/h)
Power
6,170 kW (8,270 hp); 25 kV AC (6,170 kW at wheel rim) plus Cummins QSK50 Stage V diesel (1,790 kW); AC/AC; HVO fuel; tractive effort 500 kN · how it works
Profile
main-line
Status
99001 first commercial train 28 July 2026; at least 99001-99013 delivered by Sept 2026 (99013 appears in a RAIL report). 99001-020 no train supply, 99021-030 with ETS (for Belmond). 13 more may be ordered for Caledonian Sleeper (not confirmed).

unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top