Rolling stock › In serviceData updated

Class 18 battery-hybrid shunter (Clayton CBD90 Hybrid+)

Class 18 battery-hybrid shunter (Clayton CBD90 Hybrid+): a diesel-battery shunter locomotive (Bo'Bo' (UIC)), built by Clayton Equipment Company, Burton upon Trent, 2021 onwards (first delivered Feb 2022). A freight locomotive: not drawn yet (set FRT).

Drawing to come

Type
diesel-battery shunter locomotive
Builder
Clayton Equipment Company, Burton upon Trent
Built
2021 onwards (first delivered Feb 2022)
In service
since 2021
Top speed
12 mph (19 km/h)
Power
416 kW (558 hp); JCB DIESELMAX 430 diesel generator plus 524 kWh lead-acid batteries; DC motors · how it works
Profile
main-line
Status
GBRf leased four from Beacon (Aug 2024); Tata Steel and Sellafield also use the type.

unverified Some of these figures haven’t yet been checked against an official source or a published history. What’s in doubt ↓

Sources

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

unverified

Know a source for one of these? Send it to us → (opens in a new tab)

Top